Solar and renewables in Islington

Islington received 54 renewable energy applications in the last 12 months, including 1 battery storage site and 25 heat pumps. Of the 41 decided so far, 40 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Islington

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 13 of 13 applications
23 Oct 2026 VALIDATED P2026/1030/FUL

8 Brooksby Street, London, N1 1HA

Retrospective air source heat pump to rear garden. [linked to listed building consent ref. P2025/2729/LBC].

Full Planning Application Islington
16 Oct 2026 VALIDATED P2026/2673/FUL

195 Tufnell Park Road, London, N7 0PU

Erection of rear dormer roof extension (to include solar panels) and installation of 2x front rooflights

Full Planning (Householder) Islington
12 Oct 2026 VALIDATED P2026/2252/FUL

St Clement With St Barnabas And St Matthew Church, King Square, London, EC1V 8DA

Installation of an air source heat pump heating system comprising external condenser units within acoustic enclosures and internal fan coil units with...

Full Planning Application Islington
2 Oct 2026 VALIDATED P2026/2572/FUL

14 Alwyne Square, London, N1 2JX

installation of air source heat pump to rear garden

Full Planning (Householder) Islington
24 Sept 2026 OFFICER REVIEW P2026/2303/FUL

135-137 Cloudesley Road, London, N1 0EN

Installation of external Air Source Heat Pump (ASHP) unit in lightwell.

Full Planning (Householder) Islington
17 Sept 2026 VALIDATED P2026/1897/FUL

St George's Church, 74 Crayford Road, London, N7 0ND

Installation of 56 Solar panels to the main flat roof and inverter cabinet. Landscaping rear yard.

Full Planning Application Islington
14 Sept 2026 VALIDATED P2026/2416/LBC

92 Cloudesley Road, London, N1 0EB

Full internal refurbishment (to include removal and reinstatement of main stairway to original location, new kitchens, bathrooms and services througho...

Listed Building Islington
14 Sept 2026 VALIDATED P2026/2412/FUL

92 Cloudesley Road, London, N1 0EB

Full internal refurbishment (to include removal and reinstatement of main stairway to original location, new kitchens, bathrooms and services througho...

Full Planning (Householder) Islington
8 Sept 2026 Approved 26 Oct P2026/2371/FUL

4 Chantry Street, London, N1 8NL

Installation of solar panels and 3 rooflights on the valley roof and replacement

Full Planning (Householder) Islington
19 Aug 2026 Approved 30 Sep P2026/2124/FUL

13 Willow Bridge Road, London, N1 2LB

Installation of mechanical plant comprising air source heat pumps and an air han

Full Planning (Householder) Islington
6 Aug 2026 FINAL DECISION P2026/2097/OBS

Second Floor Flat 41 Charterhouse Square London EC1M 6EA

Observations to the City of London on the development 'Application for installation of an Air Source Heat Pump (ASHP) to flat roof area' (City of Lond...

Observations to Adjoining Borough Islington
5 Aug 2026 VALIDATED P2026/1844/FUL

17 Bowling Green Lane, London, EC1R 0QB

Installation of a new plant equipment with brickwork screen, acoustic lid and new dormer for plant compound access to rear. Installation of photovolta...

Full Planning Application Islington
5 Aug 2026 VALIDATED P2026/1846/FUL

7 Huddleston Road, London, N7 0RE

Amalgamation of three existing flats into one self-contained dwelling; erection of a part single/part two storey rear extension and rear dormer roof e...

Full Planning Application Islington
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Islington

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Islington?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Islington. You can also narrow the alert to a postcode, street, or drawn area.

We check Islington's planning portal daily. New solar & renewables applications appear here within a day of being published.