43 Irving Road, London, W14 0JT Data via plota.co.uk

P/2026/02603/HH - Householder Application REGISTERED: Under Consultation

Proposal

Erection of black painted metal railings around the flat roof of the existing back addition at second floor level, in connection with the creation of a roof terrace; removal of existing glass balustrade to existing French doors to the rear elevation at second floor level, to provide access to the proposed roof terrace; erection of black painted metal railings above the existing parapet wall around the flat roof of the existing back addition at ground floor level, in connection with the creation of a roof terrace; and replacement of existing window with a door to the rear elevation at ground floor level, to provide access to the proposed roof terrace. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Oct 2026
✓
Validated
14 Oct 2026
Decision
Expected by 9 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 17 Dec 2026 and 4 Jan 2027, from Hammersmith and Fulham's recent extensions.

Comments are open until 13 Nov 2026

Comment on this application ↗

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Lakeside/Sinclair/Blythe Road conservation area
Also 3B. Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 794 m away: Thames Tideway Tunnel
The site is 794 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £2,500,000 in August 2019. Terraced house, freehold.

30 August 2019£2,500,000
5 June 2014£1,700,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area244 m² (2,626 sq ft)
Energy ratingD (56 out of 100), could reach C
PropertyMid-terrace house, 7 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in December 2016, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder Application
Postcode
W14 0JT
Received
13 Oct 2026
Validated
14 Oct 2026
Ward
Brook Green
Case officer
Show
Applicant
Show

Decision outlook

Day 5 of the 56-day target. Hammersmith and Fulham usually decides extensions by day 72.

Day 567 days to the predicted decision (day 72)
27%decided within 8 weeks
98%approved
385decided in the last year

Plota live figures for extensions decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
16 Oct 2026
Comments by
13 Nov 2026
Statutory expiry
9 Dec 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.