Land At Brookwood Military Cemetery Dawney Hill Pirbright Woking Surrey Data via plota.co.uk

TREE/2026/8185 - Works to Trees Covered by a TPO Approved

Proposal

Please see attached document for schedule of works. (Works subject to TPO ). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 16 Jul 2026
✓
Approved
1 Sept 2026

Approved on 1 Sept 2026 · Delegated · Last checked 24 Sept 2026

Site constraints 8

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Brookwood Cemetery conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: Brookwood Cemetery
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Priority habitat: Deciduous woodland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Registered park or garden 8 m away: Brookwood Cemetery
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
1 listed building within 150 m
Nearest: The Brookwood Memorial, Grade II, 44 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Woking - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Woking
Application type
Works to Trees Covered by a TPO
Received
around 16 Jul 2026
Validated
16 Jul 2026
Ward
Heathlands
Case officer
Show
Target decision
10 Sept 2026
Decision
Permitted
Decision date
1 Sept 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 47 days from validation, 4 days faster than Woking's median of 51 for tree and landscaping works. Approved, as 94% of tree and landscaping works here are.

78%decided within 8 weeks
94%approved
223decided in the last year

Plota live figures for tree and landscaping works decided by Woking in the last twelve months, from validation. Woking decision record →

Public comments

No public comments yet.

Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
10 Sept 2026
Env. assessment
No
Woking
Planning Authority Score
3.1/10
Poor
#234 of 296 councils
Relevant to this application:
Householder decisions

Woking is slower than most councils at deciding householder applications, ranking #217 out of 296. Woking is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Woking decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #254 of 296
84%
Householder approved
Below avg (90%) #258 of 296
54%
Decided in 8 weeks
Below avg (63%) #217 of 296
38%
Extended time limit
Below avg (41%) #136 of 296
55%
Minor dwellings approved
40 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
72%
Change of use approved
18 decided
736
Total decisions
133 refused in the year to March 2026