Linthwaite Brandon Road Stubton Lincolnshire NG23 5BY Data via plota.co.uk

S26/1554 - Works to TPO Tree(s) Awaiting decision

Proposal

Removal of Lime tree. (TPO-247). Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
8 Sept 2026
Validated
9 Sept 2026
Decision
Expected by 4 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 11 Oct 2026, from South Kesteven's recent tree and landscaping works.

Site constraints 3

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map, which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
2 listed buildings within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to TPO Tree(s)
Postcode
NG23 5BY
Received
8 Sept 2026
Validated
9 Sept 2026
Ward
Loveden Heath Ward
Parish
Stubton Parish Council
Case officer
Show
Target decision
4 Nov 2026
Applicant
Show

Decision outlook

Day 3 of the 56-day target. South Kesteven usually decides tree and landscaping works by day 32.

Day 353 days to the 56-day target
89%decided within 8 weeks
97%approved
5%go to committee

Plota live figures for tree and landscaping works decided by South Kesteven in the last twelve months, from validation. South Kesteven decision record →

Public comments

No public comments yet.

Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
4 Nov 2026
Env. assessment
No
South Kesteven
Planning Authority Score
2.7/10
Poor
#244 of 296 councils
Relevant to this application:
Householder decisions

South Kesteven is slower than most councils at deciding householder applications, ranking #262 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
South Kesteven decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #100 of 296
94%
Householder approved
Above avg (90%) #118 of 296
43%
Decided in 8 weeks
Below avg (63%) #262 of 296
60%
Extended time limit
Above avg (41%) #270 of 296
69%
Minor dwellings approved
110 decided (1-9 homes)
90%
Major dwellings approved
20 decided (10+ homes)
87%
Change of use approved
55 decided
1,002
Total decisions
95 refused in the year to March 2026