Development Rear of Pevensey Court, Churchfields, South Woodford, London Data via plota.co.uk

2097/26 - Full Planning Permission Under assessment

Proposal

Demolish existing garages and associated hardstanding. Erection of 3 dwellings (3x3 bedroom) with associated waste/refuse, cycle storage, amenity space and landscaping works (Summary) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Aug 2026
✓
Validated
14 Aug 2026
Decision
Target date was 7 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 75.

The consultation period closed on 9 Sept 2026.

Site constraints 3

Air quality management area: Redbridge AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Inside the Redbridge built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Redbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Redbridge
Application type
Full Planning Permission
Received
7 Aug 2026
Validated
14 Aug 2026
Ward
Churchfields
Case officer
Show
Target decision
7 Oct 2026
Applicant
Show
Agent
MJP Planning

Decision outlook

Day 75, past the statutory target. 88% of demolitions in Redbridge are decided within thirteen weeks, which runs to 13 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 27 Oct 2026.

Day 7519 days past the 56-day target
71%decided within 8 weeks
84%approved
149decided in the last year

Plota live figures for demolitions decided by Redbridge in the last twelve months, from validation. Redbridge decision record →

Consultation & key dates

Alt. reference
PP-15140794
Comments by
9 Sept 2026
Site or press notice
19 Aug 2026
Statutory expiry
9 Sept 2026
Redbridge
Planning Authority Score
4.5/10
Below average
#174 of 296 councils
Relevant to this application:
Householder decisions

Redbridge ranks #129 out of 296 councils for householder decision speed. Redbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Redbridge decision statistics
Based on MHCLG data, the year to March 2026
72%
Overall approval rate
Below avg (87%) #292 of 296
82%
Householder approved
Below avg (90%) #267 of 296
69%
Decided in 8 weeks
Above avg (63%) #129 of 296
34%
Extended time limit
Below avg (41%) #90 of 296
57%
Minor dwellings approved
152 decided (1-9 homes)
83%
Major dwellings approved
12 decided (10+ homes)
32%
Change of use approved
192 decided
1,673
Total decisions
461 refused in the year to March 2026