17 Summer Street City Centre Aberdeen AB10 1SB Data via plota.co.uk

261045/DPP - Detailed Planning Permission Pending

Proposal

Change of use and conversion of first floor shop unit to a two-bedroom residential flat Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
7 Sept 2026
Decision
Expected by 6 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 2 Nov 2026 and 9 Nov 2026, from Aberdeen's recent changes of use.

Site constraints 2

Grade B listed: Gilcomston South Church, Union Street, Aberdeen
List entry LB20676 · 29 m from the pin · 8 more listed buildings within 150 m (3 Grade B, 5 Grade C)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 8 with distances
Historic Environment Scotland ↗
Conservation area 16 m away: The City Centre Conservation Area
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Aberdeen - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Aberdeen
Application type
Detailed Planning Permission
Postcode
AB10 1SB
Received
7 Sept 2026
Validated
7 Sept 2026
Ward
Mid Stocket/Rosemount
Parish
City Centre
Target decision
6 Nov 2026
Applicant
Show
Agent
Squire Associates

Decision outlook

Day 5 of the 56-day target. Aberdeen usually decides changes of use by day 59.

Day 554 days to the predicted decision (day 59)
42%decided within 8 weeks
90%approved
100decided in the last year

Plota live figures for changes of use decided by Aberdeen in the last twelve months, from validation. Aberdeen decision record →

Public comments

No public comments yet.

Last counted 9 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
6 Nov 2026
Env. assessment
No