Spring House Farm Sadberge Road Middleton St George Darlington Data via plota.co.uk

26/00960/FUL - Full Application Awaiting decision

Proposal

Change of use of an existing barn and paddock from agricultural/equestrian use to a dog training facility, together with the erection of boundary fencing Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Sept 2026
✓
Validated
19 Oct 2026
✓
Consultation
21 Oct 2026
Decision
Expected by 14 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 2 Dec 2026 and 10 Dec 2026, from Darlington's recent commercial premises.

Comments are open until 11 Nov 2026

Comment on this application ↗

Site constraints 2

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 22 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Darlington - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Darlington
Application type
Full Application
Received
29 Sept 2026
Validated
19 Oct 2026
Ward
Sadberge And Middleton St George
Parish
Sadberge Parish Council
Case officer
Show
Target decision
14 Dec 2026
Applicant
Show
Agent
ELG Planning

Decision outlook

Day 9 of the 56-day target. Darlington usually decides commercial premises by day 49.

Day 947 days to the 56-day target
75%decided within 8 weeks
93%approved
71decided in the last year

Plota live figures for commercial premises decided by Darlington in the last twelve months, from validation. Darlington decision record →

Public comments

No public comments yet.

5 neighbours consulted · Last counted 22 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
21 Oct 2026
Consultation
21 Oct 2026
Comments by
11 Nov 2026
Statutory expiry
14 Dec 2026
Env. assessment
No
Darlington
Planning Authority Score
7.5/10
Good
#43 of 296 councils
Relevant to this application:
Change of use

Darlington ranks #137 out of 296 councils for householder decision speed. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Darlington decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #109 of 296
98%
Householder approved
Above avg (90%) #14 of 296
67%
Decided in 8 weeks
Above avg (63%) #137 of 296
33%
Extended time limit
Below avg (41%) #73 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
76%
Change of use approved
25 decided
465
Total decisions
46 refused in the year to March 2026