56 - 58 Marsh Wall, London E14 9TP Data via plota.co.uk

PA/25/01624/S - Non-material amendment (TCPA S96a) Registered

Proposal

Application for Non-Material amendment to planning permission ref: , Dated 28/07/2023. Non Material amendment(s) Sought: The application seeks permission to make alterations to facilitate an uplift in co-living units from 805 to 835 (uplift of 30). Changes are proposed to the ground floor and elevations of the host building also. The application also seeks permission to amend Schedule 11 of the s106 to ensure compliance with the Renters' Rights Act 2025. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 15 Sept 2025
Decision
Target date was 13 Oct 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 408.

Documents 27

Plans & drawings 17

PDF P23105-FCH-BA-XX-DR-A-1300 P08 B - BASEMENT FLOOR GA PLAN - PROPOSED Current Plan · 24 Jul 2026 View ↗ PDF P23105-FCH-P23105-FCH-BA-XX-DR-A-1301 P08-XX-DR-A-1300 P08 G - GROUND FLOOR GA PLAN - PROPOSED Current Plan · 24 Jul 2026 View ↗ PDF P23105-FCH-BA-XX-DR-A-1303 P08 TYPICAL LOWER COMMUNITY LEVEL - PROPOSED Current Plan · 24 Jul 2026 View ↗ PDF P23105-FCH-BA-XX-DR-A-1304 P08 TYPICAL MIDDLE COMMUNITY LEVEL - PROPOSED Current Plan · 24 Jul 2026 View ↗ PDF P23105-FCH-BA-XX-DR-A-1305 P08 TYPICAL UPPER COMMUNITY LEVEL - PROPOSED Current Plan · 24 Jul 2026 View ↗ PDF P23105-FCH-BA-XX-DR-A-1306 P07 44 - FORTY-FOURTH FLOOR GA PLAN Current Plan · 24 Jul 2026 View ↗ PDF P23105-FCH-BA-ZZ-DR-A-1404 P5 PARTIAL NORTH ELEVATION Current Plan · 24 Jul 2026 View ↗ PDF P23105-FCH-BA-ZZ-DR-A-4000 P11 GA - ELEVATION NORTH Current Plan · 24 Jul 2026 View ↗ PDF P23105-FCH-BA-XX-DR-A-1300 REV P09 B - BASEMENT FLOOR GA PLAN (PROPOSED) Current Plan · 23 Oct 2025 View ↗ PDF P23105-FCH-BA-XX-DR-A-1305 P08 TYPICAL UPPER COMMUNITY LEVEL - PROPOSED LEVELS Current Plan · 15 Sept 2025 View ↗ PDF P23105-FCH-BA-XX-DR-A-1304 P08 TYPICAL MIDDLE COMMUNITY LEVEL - PROPOSED LEVELS Current Plan · 15 Sept 2025 View ↗ PDF P23105-FCH-BA-ZZ-DR-A-4000 P11 GA - ELEVATION NORTH Current Plan · 15 Sept 2025 View ↗ PDF P23105-FCH-BA-XX-DR-A-1200 P03 PROPOSED SITE PLAN Current Plan · 15 Sept 2025 View ↗ PDF P23105-FCH-BA-XX-DR-A-1303 P08 TYPICAL LOWER COMMUNITY LEVEL - PROPOSED LEVELS Current Plan · 15 Sept 2025 View ↗ PDF P23105-FCH-BA-ZZ-DR-A-1404 P5 PARTIAL NORTH ELEVATION Current Plan · 15 Sept 2025 View ↗ PDF P23105-FCH-BA-XX-DR-A-1301 P08 G - GROUND FLOOR GA PLAN - PROPOSED Current Plan · 15 Sept 2025 View ↗ PDF P23105-FCH-BA-XX-DR-A-1306 P07 44 FLOOR GA PLAN Current Plan · 15 Sept 2025 View ↗

All documents on the council site ↗

Associated applications 8

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Canary Wharf. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: Tower Hamlets APA 3.1
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 40 m away: Thames Tideway Tunnel
The site is about 40 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, about 1608 m); London Strategic Heat Main Project (at pre-application, about 1762 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Tower Hamlets built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 12 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-material amendment (TCPA S96a)
Postcode
E14 9TP
Received
around 15 Sept 2025
Validated
15 Sept 2025
Ward
Canary Wharf
Case officer
Show
Target decision
13 Oct 2025
Decision level
Delegated
Applicant
Show
Agent
DP9 LTD
Leaseholder
Show

Decision outlook

Day 408, past the statutory target. 87% of amendments in Tower Hamlets are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 26 Oct 2026.

Day 408352 days past the 56-day target
70%decided within 8 weeks
93%approved
136decided in the last year

Plota live figures for amendments decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Statutory expiry
13 Oct 2025
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.