Old House Farm, Cut End Road, Fishtoft, Boston, PE22 0QZ Data via plota.co.uk

B/26/0220 - Full Planning Permission Awaiting decision

Proposal

Demolition of existing agricultural buildings and erection of 1no. dwellinghouse with associated access, parking and landscaping (self build) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 May 2026
✓
Validated
26 May 2026
✓
Consultation
27 May 2026
Decision
Expected by 21 Jul 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 136.

The consultation period closed on 17 Jun 2026.

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 1
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 407 m away: Outer Dowsing Offshore Wind (Generating Station)
The site is 407 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area191 m² (2,056 sq ft)
Energy ratingF (36 out of 100), could reach B
PropertyDetached house, 7 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, oil
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in January 2018, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Boston - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Boston
Application type
Full Planning Permission
Postcode
PE22 0QZ
Received
20 May 2026
Validated
26 May 2026
Ward
Fishtoft Ward
Parish
Fishtoft
Case officer
Show
Target decision
21 Jul 2026
Applicant
Show
Agent
Neil Dowlman Architecture Ltd

Decision outlook

Day 136, past the statutory target. 82% of full applications in Boston are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 13680 days past the 56-day target
41%decided within 8 weeks
91%approved
147decided in the last year

Plota live figures for full applications decided by Boston in the last twelve months, from validation. Boston decision record →

Public comments

No public comments yet.

8 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14870475
Planning Portal ref
PP-14870475
Neighbours
27 May 2026
Consultation
27 May 2026
Comments by
17 Jun 2026
Statutory expiry
21 Jul 2026
Env. assessment
No

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.