18 Home Street Edinburgh EH3 9LY Data via plota.co.uk

26/01953/ADV - Advert Consent Approved

Proposal

Fascia sign, projecting sign. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 May 2026
✓
Approved
23 Jun 2026

Approved on 23 Jun 2026 · Delegated Decision · Last checked 20 Jul 2026

Site constraints 4

Grade B listed: 1, 3 Lochrin Terrace, Edinburgh
List entry LB47783 · 30 m away · 7 more listed buildings within 150 m (4 Grade B, 3 Grade C)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 7 with distances
Historic Environment Scotland ↗
Also on the record
World heritage site 185 m away: Edinburgh World Heritage Site Boundary; Scheduled monument 248 m away: Union Canal, Fountainbridge to River Almond; SSSI 497 m away: Arthur's Seat Volcano.
Not affected
Outside flood zones 2 and 3

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Edinburgh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Edinburgh
Application type
Advert Consent
Postcode
EH3 9LY
Received
6 May 2026
Validated
6 May 2026
Ward
City Centre
Parish
Tollcross
Case officer
Show
Target decision
3 Jul 2026
Decision
Granted
Decision date
23 Jun 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 48 days from validation, 7 days faster than Edinburgh's median of 55 for signs and adverts. Approved, as 89% of signs and adverts here are.

54%decided within 8 weeks
89%approved
200decided in the last year

Plota live figures for signs and adverts decided by Edinburgh in the last twelve months, from validation. Edinburgh decision record →

Consultation & key dates

Env. assessment
No