FORMER SITE OF MOLSON COORS BREWING CO, MANOR PARK Lower Turk Street, Alton, Hampshire Data via plota.co.uk

25050/066 - Section 106 Agreement Approved

Proposal

Deed of Variation to S106 Agreement dated 19 May 2021 attached to planning applications and . There are 4 modifications sought: 1) To amend occupancy of properties to permit residents to stay beyond their 40th birthday, thus removing the potential that a long standing tenant will need to be evicted on the grounds of age. 2) To open up the tenancies to persons for Treloar College as well as the school. 3) To open up the tenancies to wheel chair users more generally who work or live in East Hampshire adding to flexibility of use. 4) To open up the use of the flats to carers supporting Treloar Eligible persons more generally. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Sept 2023
✓
Validated
19 Sept 2023
✓
Approved
26 Oct 2026

Approved on 26 Oct 2026 · Delegated · Last checked 27 Oct 2026

Site constraints 7

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
3 listed buildings within 150 m; National infrastructure project 1554 m away: Southampton to London Pipeline Project; Flood defence 22 m away (natural high ground, designed for a 1 in 5 year flood); Tree preservation order 16 m away: (EH1162)21; Inside the Alton (East Hampshire) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 27 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Hampshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Section 106 Agreement
Received
1 Sept 2023
Validated
19 Sept 2023
Ward
Alton Westbrooke
Parish
Alton CP
Case officer
Show
Target decision
14 Nov 2023
Decision
APPROVAL
Decision date
26 Oct 2026
Decision level
Delegated
Applicant
Show

Consultation & key dates

Statutory expiry
14 Nov 2023
East Hampshire
Planning Authority Score
1.5/10
Poor
#282 of 296 councils
Relevant to this application:
Householder decisions

East Hampshire is one of the slowest councils in England for householder decisions, ranking #293 out of 296. The council extends the time limit on 72% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Hampshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #153 of 296
91%
Householder approved
Above avg (90%) #173 of 296
24%
Decided in 8 weeks
Below avg (63%) #293 of 296
72%
Extended time limit
Above avg (41%) #288 of 296
63%
Minor dwellings approved
72 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
88%
Change of use approved
24 decided
606
Total decisions
72 refused in the year to March 2026