81 Jermyn Street London SW1Y 6JF Data via plota.co.uk

Pending 26/05011/FULL
Date received
27 Jul 2026
Date validated
27 Jul 2026
Postcode
SW1Y 6JF

Description

Variation of condition 1 of planning permission dated 30 October 2025 (RN: 24/03521/FULL) for the: Internal and external refurbishment, comprising of works to the Jermyn Street entrance, Duke Street entrance, external facade, provision of green roofs at terrace levels, extension to level 02 podium and inclusion of a garden room extension, and internal reconfigurations, with associated works. NAMELY, to allow revisions to the rooftop plant layout to accommodate existing telecoms equipment; introduction of plant screens to Level 2; revised design to the proposed Duke Street entrance; introduction of a metal balustrade at the Level 2 podium; introduction of a flat bronze metal finish to Levels 2 and 3; removal of the balustrade from the green roof, and introduction of a fall restraint system; amendments to the facade perforations to the projecting window surrounds for ventilation purposes; introduction of translucent glazing to promote privacy within bathrooms; retention of louvres to provide air flow to the Mason's Yard elevation refuse store; and replacement of the ground floor level external doors to align with fire strategy requirements. Data via plota.co.uk

Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision performance
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026