Application progress

✓
Received
around 3 Nov 2025
✓
Consultation
23 Dec 2025
✓
Approved
20 Jan 2026
✗
Appeal dismissed
10 Sept 2026

Approved on 20 Jan 2026 · Delegated Decision · Last checked 12 Oct 2026

Site constraints 9

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
4 listed buildings within 150 m
Nearest: Central Bridge, Grade II, 16 m away · 4 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 4 with distances
Historic England ↗
Also on the record
Special protection area 414 m away: Solent and Dorset Coast; Conservation area 78 m away: Oxford Street; Inside the Southampton built-up area; National infrastructure project 1390 m away: Solent Gateway 2, at pre-application; Air quality management area 74 m away: AQMA No.4 (Town Quay).
Not affected
Not green belt · No scheduled monument at the site

Checked on 8 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Received
around 3 Nov 2025
Validated
3 Nov 2025
Ward
Bargate
Case officer
Show
Target decision
23 Jan 2026
Decision
Approve with Conditions
Decision date
20 Jan 2026
Decision level
Delegated Decision
Appeal
Dismissed · 10 Sept 2026 · Written Representations · Inspectorate case 6007431 ↗
Applicant
Show
Agent
Barton Court Consulting Ltd

How this decision compares

Decided in 78 days from validation, 23 days slower than Southampton's median of 55 for full applications. Approved, as 93% of full applications here are.

69%decided within 8 weeks
93%approved
5%go to committee

Plota live figures for full applications decided by Southampton in the last twelve months, from validation. Southampton decision record →

Public comments

No public comments yet.

53 neighbours consulted · Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
38479
Neighbours
23 Dec 2025
Consultation
23 Dec 2025
Comments by
13 Jan 2026
Statutory expiry
29 Dec 2025
Env. assessment
No
Southampton
Planning Authority Score
5/10
Average
#150 of 296 councils
Relevant to this application:
Change of use

Southampton ranks #158 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southampton decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #117 of 296
93%
Householder approved
Above avg (90%) #137 of 296
63%
Decided in 8 weeks
Above avg (63%) #158 of 296
40%
Extended time limit
Below avg (41%) #154 of 296
70%
Minor dwellings approved
50 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
86%
Change of use approved
109 decided
742
Total decisions
72 refused in the year to March 2026