Northern Site, New Covent Garden Market, Nine Elms Lane Data via plota.co.uk

PA2026/0129 - Matters relating to a S106 Agreement Pending Consideration

Proposal

Matters relating to a S106 Agreement pursuant to the Car Park Management Plan for Phase 2A of the Northern Site Development Zone required under Schedule 3, Part 3, Paragraph 7.1 of the S106 Agreement dated 11/02/2015 associated with planning permission ref. . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Sept 2026
✓
Validated
20 Oct 2026
Decision
Expected by 17 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 17 Nov 2026.

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Wandsworth AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 114 m away: Thames Tideway Tunnel
The site is 114 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 670 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Wandsworth built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 21 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wandsworth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wandsworth
Application type
Matters relating to a S106 Agreement
Received
22 Sept 2026
Validated
20 Oct 2026
Ward
Nine Elms Ward
Case officer
Show
Target decision
17 Nov 2026
Applicant
Show
Agent
Jane Kistler

Consultation & key dates

Statutory expiry
10 Nov 2026
Wandsworth
Planning Authority Score
4.8/10
Below average
#164 of 296 councils
Relevant to this application:
Householder decisions

Wandsworth ranks #172 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Wandsworth decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #120 of 296
92%
Householder approved
Above avg (90%) #168 of 296
62%
Decided in 8 weeks
Below avg (63%) #172 of 296
37%
Extended time limit
Below avg (41%) #124 of 296
89%
Minor dwellings approved
680 decided (1-9 homes)
81%
Major dwellings approved
16 decided (10+ homes)
72%
Change of use approved
36 decided
2,062
Total decisions
206 refused in the year to March 2026