Caravan, OAKVALE, Llanwnnen, Lampeter, Ceredigion, SA48 7LF Data via plota.co.uk

A240929 - Full Planning Approved

Proposal

Retrospective planning permission for the retention of temporary caravan (accommodation and reception for site owners), serving the existing glamping site, for a period of 3 years Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Dec 2024
✓
Committee
8 Oct 2025
✓
Approved
9 Oct 2025

Approved on 9 Oct 2025 · Planning Committee Main Item / Prif Eitem · Last checked 1 Oct 2026

Planning committee

Decided by Ceredigion Development Management Committee on 8 Oct 2025.

Approved

Against officer advice: officers had recommended refusal.

  • Officers advised refusal because the glamping business did not justify continuous on-site accommodation and the proposal harmed countryside character.
  • The community council and land drainage service raised no objection, highways had no observations, ecology raised no objection subject to lighting controls, and no third-party representations were received.
  • The committee approved the caravan for three years, citing the new owners’ opportunity, security, 24-hour site needs, office and storage use, and potential employment.
Read how the committee decided The proposal, site history, officers’ assessment, consultation responses, committee debate and decision.

Source: Plota analysis of Ceredigion's committee minutes of 8 Oct 2025.

Site constraints 4

Nutrient neutrality catchment: Afon Teifi
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special area of conservation about 226 m away: Afon Teifi / River Teifi
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI about 226 m away: Afon Teifi.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 26 September 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £300,000 in May 2024. Other property, freehold.

17 May 2024£300,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Ceredigion - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ceredigion
Application type
Full Planning
Postcode
SA48 7LF
Received
5 Dec 2024
Validated
5 Dec 2024
Ward
Llanwenog ED
Parish
Llanwnnen Community
Case officer
Show
Target decision
17 Oct 2025
Decision
Temporary permission
Decision date
9 Oct 2025
Decision level
Planning Committee Main Item / Prif Eitem
Applicant
Show

How this decision compares

Decided in 308 days from validation, 253 days slower than Ceredigion's median of 55 for commercial and major works. Approved, as 79% of commercial and major works here are.

63%decided within 8 weeks
79%approved
5%go to committee

Plota live figures for commercial and major works decided by Ceredigion in the last twelve months, from validation. Ceredigion decision record →

Consultation & key dates

Committee
8 Oct 2025
Statutory expiry
17 Oct 2025