Land Adjacent Biggin Lane And Chadwell Hill Chadwell St Mary Essex Data via plota.co.uk

25/01276/FUL - Full Planning Permission Application Approved

Proposal

Erection of 116 residential dwellings, and provision of associated infrastructure including access roads, car parking, public open space and landscaping Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Oct 2025
✓
Approved
21 Sept 2026

Approved on 21 Sept 2026 · Committee Decision · Last checked 11 Oct 2026

Planning committee

Decided by Thurrock Planning Committee on 14 Apr 2026, in a recorded vote.

Approved by 7 votes to 2

As officers recommended.

  • Officers advised approval because the site was Grey Belt, met the Golden Rules and would provide much-needed affordable housing.
  • Residents and biodiversity groups raised concerns about traffic, infrastructure, character, pollution and the site’s ecological value.
  • The committee approved the recommendation by seven votes to two, subject to a legal agreement and planning conditions.
Read how the committee decided The proposal, site history, officers’ assessment, objections, committee debate, vote and decision. Includes the meeting recording

Source: Plota analysis of Thurrock's committee minutes of 14 Apr 2026.

Documents 238

Statements & assessments 33

PDF LANDSCAPE AND ECOLOGY Consultee Comment · 16 Mar 2026 View ↗ PDF LANDSCAPE AND ECOLOGY Consultee Comment · 16 Mar 2026 View ↗ PDF DRAINAGE STRATEGY Current Plan · 13 Mar 2026 View ↗ PDF FINAL INVERTEBRATE ASSESSMENT Studies and Reports · 4 Mar 2026 View ↗ PDF GEO-ENVIRONMENTAL ASSESSMENT Studies and Reports · 6 Feb 2026 View ↗ PDF OVERLAND FLOOD ROUTES Current Plan · 6 Feb 2026 View ↗ PDF DRAINAGE STRATEGY Superseded Plan · 6 Feb 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT - ADDENDUM Studies and Reports · 26 Jan 2026 View ↗ PDF HEALTH IMPACT ASSESSMENT Studies and Reports · 10 Dec 2025 View ↗ PDF BIODIVERSITY NET GAIN ASSESSMENT Studies and Reports · 31 Oct 2025 View ↗ PDF BIODIVERSITY NET GAIN METRIC Studies and Reports · 31 Oct 2025 View ↗ PDF ARBORICULTURAL IMPLICATIONS REPORT Studies and Reports · 24 Oct 2025 View ↗ PDF ARCHAEOLOGICAL DESK-BASED ASSESSMENT COMPRESSED Studies and Reports · 24 Oct 2025 View ↗ PDF BNG NOTE Studies and Reports · 24 Oct 2025 View ↗ PDF ECOLOGICAL IMPACT ASSESSMENT Studies and Reports · 24 Oct 2025 View ↗ PDF PRELIMINARY ECOLOGICAL APPRAISAL REPORT Studies and Reports · 24 Oct 2025 View ↗ PDF FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY COMPRESSED Studies and Reports · 24 Oct 2025 View ↗ PDF CHADWELL HILL - BUILT HERITAGE STATEMENT Studies and Reports · 24 Oct 2025 View ↗ PDF GREEN BELT ASSESSMENT (182-RE03-GB_V6) Studies and Reports · 24 Oct 2025 View ↗ PDF LANDSCAPE AND VISUAL IMPACT ASSESSMENT Studies and Reports · 24 Oct 2025 View ↗ PDF NOISE ASSESSMENT Studies and Reports · 24 Oct 2025 View ↗ PDF ENERGY AND SUSTAINABILITY STATEMENT Studies and Reports · 24 Oct 2025 View ↗ PDF NWM PROPERTIES - CHADWELL ST MARY - STATEMENT OF COMMUNITY INVOLVEMENT - SEPTEMB Studies and Reports · 24 Oct 2025 View ↗ PDF TRANSPORT ASSESSMENT COMPRESSED Studies and Reports · 24 Oct 2025 View ↗ PDF 3311-MA-RP001 LANDSCAPE STATEMENT COMPRESSED Studies and Reports · 24 Oct 2025 View ↗ PDF 28514 - CHADWELL HILL(A)9.1 - AIR QUALITY ASSESSMENT - REV 1 - FINAL Studies and Reports · 24 Oct 2025 View ↗ PDF LAND SOUTH OF CHADWELL ST MARYS FLOOD RISK SEQUENTIAL TEST Studies and Reports · 24 Oct 2025 View ↗ PDF GEOENVIRONMENTAL ASSESSMENT APPENDIX 2 OF 2 Studies and Reports · 24 Oct 2025 View ↗ PDF GEOENVIRONMENTAL ASSESSMENT Studies and Reports · 24 Oct 2025 View ↗ PDF GEOENVIRONMENTAL ASSESSMENT APPENDIX 1 OF 2 COMPRESSED Studies and Reports · 24 Oct 2025 View ↗ PDF CHADWELL ST MARY - PLANNING STATEMENT 190925 Studies and Reports · 24 Oct 2025 View ↗ PDF BIODIVERSITY NET GAIN ASSESSMENT Studies and Reports · 24 Oct 2025 View ↗ PDF BIODIVERSITY NET GAIN ASSESSMENT Studies and Reports · 24 Oct 2025 View ↗

Plans & drawings 146

PDF UNIT MIX PLAN Current Plan · 30 Mar 2026 View ↗ PDF SITE LEVELS PLAN Current Plan · 30 Mar 2026 View ↗ PDF POST PLANNING DRAWING LIST Current Plan · 13 Mar 2026 View ↗ PDF SOL(S)-SOUTER-LIFE_GLOVER-GF PLAN-SEMI Current Plan · 13 Mar 2026 View ↗ PDF SOL(S)-SOUTER-LIFE_GLOVER-FF PLAN-SEMI Current Plan · 13 Mar 2026 View ↗ PDF ROOF PLAN Current Plan · 12 Mar 2026 View ↗ PDF PARKING STRATEGY Current Plan · 12 Mar 2026 View ↗ PDF MATERIALS STRATEGY PLAN Current Plan · 12 Mar 2026 View ↗ PDF REFUSE STRATEGY PLAN Current Plan · 12 Mar 2026 View ↗ PDF DRAWING REGISTER - POST PLANNING AMENDMENTS Superseded · 6 Mar 2026 View ↗ PDF UNIT MIX PLAN Current Plan · 6 Mar 2026 View ↗ PDF TENURE PLAN Current Plan · 6 Mar 2026 View ↗ PDF MASSING STRATEGY Current Plan · 6 Mar 2026 View ↗ PDF GARDEN AND AMENITY PLAN Current Plan · 6 Mar 2026 View ↗ PDF BOUNDARY STRATEGY Current Plan · 6 Mar 2026 View ↗ PDF SITE LAYOUT PLAN Current Plan · 6 Mar 2026 View ↗ PDF SOL(S)-SOUTER-LIFE GLOVER - GF PLAN - SEMI Superseded Plan · 6 Mar 2026 View ↗ PDF SOL(S)-SOUTER-LIFE GLOVER - FF PLAN - SEMI Superseded Plan · 6 Mar 2026 View ↗ PDF BAL(M) BAKER-LIFE-2B-2S - PLAN - MID-TERRACE Current Plan · 6 Mar 2026 View ↗ PDF BAL(S) BAKER-LIFE-2B-2S - PLAN - SEMI-DETACHED Current Plan · 6 Mar 2026 View ↗ PDF BOL(D) BOWYER-LIFE-4B-2S - PLAN - DETACHED Current Plan · 6 Mar 2026 View ↗ PDF FRL(D) FULLER-LIFE-3B-2S - GF PLAN - DETACHED Current Plan · 6 Mar 2026 View ↗ PDF FRL(D) FULLER-LIFE-3B-2S - FF PLAN - DETACHED Current Plan · 6 Mar 2026 View ↗ PDF SA(D)-SADDLER-2B-2S - GF PLAN - DETACHED Current Plan · 6 Mar 2026 View ↗ PDF SA(D)-SADDLER-2B-2S - FF PLAN - DETACHED Current Plan · 6 Mar 2026 View ↗ PDF STREET ELEVATION A-A Current Plan · 6 Mar 2026 View ↗ PDF STREET ELEVATION B1-B1 Current Plan · 6 Mar 2026 View ↗ PDF STREET ELEVATION B2-B2 Current Plan · 6 Mar 2026 View ↗ PDF STREET ELEVATION C-C Current Plan · 6 Mar 2026 View ↗ PDF STREET ELEVATION D-D Current Plan · 6 Mar 2026 View ↗ PDF STREET ELEVATION E-E Current Plan · 6 Mar 2026 View ↗ PDF STREET ELEVATION F-F Current Plan · 6 Mar 2026 View ↗ PDF PROPOSED SITE SECTION 1-1 Current Plan · 6 Mar 2026 View ↗ PDF PROPOSED SITE SECTION 1-1 + FUTURE DEVELOPMENT Current Plan · 6 Mar 2026 View ↗ PDF PROPOSED SITE SECTION 2-2 Current Plan · 6 Mar 2026 View ↗ PDF CNL(S)-COINER-LIFE-2B-2S - TYPE 1 - ELEVATIONS - SEMI Current Plan · 6 Mar 2026 View ↗ PDF CNL(S)-COINER-LIFE-2B-2S - TYPE 2 - ELEVATIONS - SEMI Current Plan · 6 Mar 2026 View ↗ PDF CNL(S)-COINER-LIFE-2B-2S - TYPE 3 - ELEVATIONS - SEMI Current Plan · 6 Mar 2026 View ↗ PDF CNL(S)-COINER-LIFE-2B-2S - TYPE 4 - ELEVATIONS - SEMI Current Plan · 6 Mar 2026 View ↗ PDF CSL(S)-COPPERSMITH-LIFE-3B-2S - TYPE 1 - ELEVATIONS - SEMI Current Plan · 6 Mar 2026 View ↗ PDF CSL(D)-COPPERSMITH-LIFE-3B-2S - TYPE 1 - ELEVATIONS - DETACHED Current Plan · 6 Mar 2026 View ↗ PDF CSL(S)-COPPERSMITH-LIFE-3B-2S - TYPE 2 - ELEVATIONS - SEMI Current Plan · 6 Mar 2026 View ↗ PDF FEL(S)-FELTER-LIFE-3B-2S - TYPE 1 - ELEVATIONS - SEMI Current Plan · 6 Mar 2026 View ↗ PDF FEL(S)-FELTER-LIFE-3B-2S - TYPE 3 - ELEVATIONS - SEMI Current Plan · 6 Mar 2026 View ↗ PDF FRL(D)-FULLER-LIFE-3B-2S - TYPE 1 - ELEVATIONS - DETACHED Current Plan · 6 Mar 2026 View ↗ PDF TIL(S)-TILLMAN-LIFE-3B-2S - TYPE 1 - ELEVATIONS - SEMI Current Plan · 6 Mar 2026 View ↗ PDF SUMARY ACCOMMODATION SCHEDULE Current Plan · 6 Mar 2026 View ↗ PDF ILLUSTRATIVE LANDSCAPE MASTERPLAN Current Plan · 6 Mar 2026 View ↗ PDF STREET ELEVATION E-E Superseded Plan · 27 Jan 2026 View ↗ PDF STREET ELEVATION D-D Superseded Plan · 27 Jan 2026 View ↗ PDF STREET ELEVATION C-C Superseded Plan · 27 Jan 2026 View ↗ PDF STREET ELEVATION B2-B2 Superseded Plan · 27 Jan 2026 View ↗ PDF STREET ELEVATION B1-B1 Superseded Plan · 27 Jan 2026 View ↗ PDF STREET ELEVATION A-A Superseded Plan · 27 Jan 2026 View ↗ PDF CHADWELL-SITE SECTION BB Superseded Plan · 27 Jan 2026 View ↗ PDF CHADWELL-SITE SECTION AA + FUTURE DEVT Superseded Plan · 27 Jan 2026 View ↗ PDF CHADWELL-SITE SECTION AA Superseded Plan · 27 Jan 2026 View ↗ PDF FRAMEWORK TRAVEL PLAN Studies and Reports · 26 Jan 2026 View ↗ PDF SADDLER 2-BED 3-PERSON FIRST FLOOR PLAN Superseded Plan · 26 Jan 2026 View ↗ PDF SOL(S)-SOUTER-LIFE_GLOVER-GF PLAN-SEMI_P02 Superseded Plan · 26 Jan 2026 View ↗ PDF PROPOSED SEMI FIRST FLOOR PLAN Superseded Plan · 26 Jan 2026 View ↗ PDF CHADWELL SOA-TENURE AMENDS Superseded Plan · 19 Nov 2025 View ↗ PDF CHADWELL SOA-TENURE AMENDS Superseded Plan · 19 Nov 2025 View ↗ PDF FRAMEWORK TRAVEL PLAN Studies and Reports · 31 Oct 2025 View ↗ PDF SINGLE GARAGE (D)-TYPE 1-ELEVATIONS-DETACHED_P01 Current Plan · 24 Oct 2025 View ↗ PDF TWIN GARAGE (D)-TYPE 1-ELEVATIONS-DETACHED_P01 Current Plan · 24 Oct 2025 View ↗ PDF TWIN GARAGE (D)-TYPE 2-ELEVATIONS-DET_P01 Current Plan · 24 Oct 2025 View ↗ PDF SINGLE_TWIN GARAGE (D)-GF PLAN-DETACHED_P01 Current Plan · 24 Oct 2025 View ↗ PDF MAISONETTE BLOCK 1 (S)-TYPE 1-ELEVATIONS-SEMI_P01 Current Plan · 24 Oct 2025 View ↗ PDF BAL(S)-BAKER-LIFE-2B-2S-TYPE 1-ELEVATIONS-SEMI-DET_P0 Current Plan · 24 Oct 2025 View ↗ PDF BAL(S)-BAKER-LIFE-2B-2S-TYPE 2-ELEVATIONS-SEMI-DET_P0 Current Plan · 24 Oct 2025 View ↗ PDF BAL(M)-BAKER-LIFE-2B-2S-TYPE 1-ELEVATIONS-MID-TERR_P0 Current Plan · 24 Oct 2025 View ↗ PDF BAL(M)-BAKER-LIFE-2B-2S-TYPE 2-ELEVATIONS-MID-TERR_P0 Current Plan · 24 Oct 2025 View ↗ PDF BOL(D)-BOWYER-LIFE-4B-2S-TYPE 1-ELEVATIONS-DET_P01 Current Plan · 24 Oct 2025 View ↗ PDF BOL(D)-BOWYER-LIFE-4B-2S-TYPE 2-ELEVATIONS-DET_P01 Current Plan · 24 Oct 2025 View ↗ PDF BOL(D)-BOWYER-LIFE-4B-2S-TYPE 3-ELEVATIONS-DET_P01 Current Plan · 24 Oct 2025 View ↗ PDF CNL(S)-COINER-LIFE-2B-2S-TYPE 1-ELEVATIONS-SEMI_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF CNL(S)-COINER-LIFE-2B-2S-TYPE 2-ELEVATIONS-SEMI_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF CNL(S)-COINER-LIFE-2B-2S-TYPE 3-ELEVATIONS-SEMI_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF CNL(S)-COINER-LIFE-2B-2S-TYPE 4-ELEVATIONS-SEMI_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF CSL(D)-COPPERSMITH-LIFE-3B-2S-TYPE 1-ELEVATIONS-DET_P Superseded Plan · 24 Oct 2025 View ↗ PDF CSL(S)-COPPERSMITH-LIFE-3B-2S-TYPE 1-ELEVATIONS-SEMI_ Superseded Plan · 24 Oct 2025 View ↗ PDF CSL(S)-COPPERSMITH-LIFE-3B-2S-TYPE 2-ELEVATIONS-SEMI_ Superseded Plan · 24 Oct 2025 View ↗ PDF FEL(S)-FELTER-LIFE-3B-2S-TYPE 1-ELEVATIONS-SEMI_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF FEL(S)-FELTER-LIFE-3B-2S-TYPE 2-ELEVATIONS-SEMI_P01 Current Plan · 24 Oct 2025 View ↗ PDF FEL(S)-FELTER-LIFE-3B-2S-TYPE 3-ELEVATIONS-SEMI_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF FRL(D)-FULLER-LIFE-3B-2S-TYPE 1-ELEVATIONS-DET_P01 Current Plan · 24 Oct 2025 View ↗ PDF PWL(E)-PLOUGHWRIGHT-LIFE-3B-2S-TYPE 1-ELEVATIONS-END- Current Plan · 24 Oct 2025 View ↗ PDF PWL(E)-PLOUGHWRIGHT-LIFE-3B-2S-TYPE 2-ELEVATIONS-END- Current Plan · 24 Oct 2025 View ↗ PDF REL(D)-REEDMAKER-LIFE-4B-2S-TYPE 2-ELEVATIONS-DET_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF REL(D)-REEDMAKER-LIFE-4B-2S-TYPE 3-ELEVATIONS-DET_P01 Current Plan · 24 Oct 2025 View ↗ PDF REL(D)-REEDMAKER-LIFE-4B-2S-TYPE 4-ELEVATIONS-DET_P01 Current Plan · 24 Oct 2025 View ↗ PDF SA(D)-SADDLER-2B-2S-TYPE 1-ELEVATIONS-DET_P01 Current Plan · 24 Oct 2025 View ↗ PDF SOL(S)-SOUTER-LIFE_GLOVER-TYPE 1-ELEVATIONS-SEMI_P01 Current Plan · 24 Oct 2025 View ↗ PDF TIL(S)-TILLMAN-LIFE-3B-2S-TYPE 1-ELEVATIONS-SEMI_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF TIL(S)-TILLMAN-LIFE-3B-2S-TYPE 2-ELEVATIONS-SEMI_ Current Plan · 24 Oct 2025 View ↗ PDF MAISONETTE BLOCK 1 (S) (S)-GF PLAN-SEMI_P01 Current Plan · 24 Oct 2025 View ↗ PDF MAISONETTE BLOCK 1 (S)-FF PLAN-SEMI_P01 Current Plan · 24 Oct 2025 View ↗ PDF BAL(S)-BAKER-LIFE-2B-2S-PLAN-SEMI-DETACHED_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF BAL(M)-BAKER-LIFE-2B-2S- PLAN-MID-TERRACE_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF BOL(D)-BOWYER-LIFE-4B-2S-PLAN-DET_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF CNL(S)-COINER-LIFE-2B-2S-PLAN-SEMI_P01 Current Plan · 24 Oct 2025 View ↗ PDF CSL(S)-COPPERSMITH-LIFE-3B-2S- PLAN-SEMI_P01 Current Plan · 24 Oct 2025 View ↗ PDF FEL(S)-FELTER-LIFE-3B-2S-PLAN-SEMI_P01 Current Plan · 24 Oct 2025 View ↗ PDF FRL(D)-FULLER-LIFE-3B-2S-GF PLAN-DET_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF FRL(D)-FULLER-LIFE-3B-2S-FF PLAN-DET_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF PWL(E)-PLOUGHWRIGHT-LIFE-3B-2S-GF PLAN-END-TERR_P01 Current Plan · 24 Oct 2025 View ↗ PDF REL(D)-REEDMAKER-LIFE-4B-2S-PLAN-DET_P01 Current Plan · 24 Oct 2025 View ↗ PDF SA(D)-SADDLER-2B-2S-GF PLAN-DET_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF SADDLER 2-BED 3-PERSON FIRST FLOOR PLAN Superseded Plan · 24 Oct 2025 View ↗ PDF SOL(S)-SOUTER-LIFE_GLOVER-GF PLAN-SEMI_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF SOL(S)-SOUTER-LIFE_GLOVER-FF PLAN-SEMI_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF TIL(S)-TILLMAN-LIFE-3B-2S-PLAN-SEMI_P01 Current Plan · 24 Oct 2025 View ↗ PDF P13_CHADWELL HILL-UNIT MIX Superseded Plan · 24 Oct 2025 View ↗ PDF _CHADWELL HILL-SITE LEVELS Current Plan · 24 Oct 2025 View ↗ PDF _CHADWELL HILL-TENURE Superseded Plan · 24 Oct 2025 View ↗ PDF _CHADWELL HILL-PARKING STRATEGY Superseded Plan · 24 Oct 2025 View ↗ PDF LOCATION PLAN-P01 Current Plan · 24 Oct 2025 View ↗ PDF ROOF PLAN-P01 Superseded Plan · 24 Oct 2025 View ↗ PDF UNIT MIX-P15 Superseded Plan · 24 Oct 2025 View ↗ PDF TENURE PLAN-P09 Superseded Plan · 24 Oct 2025 View ↗ PDF MASSING PLAN-P01 Superseded Plan · 24 Oct 2025 View ↗ PDF PARKING STRATEGY PLAN-P04 Superseded Plan · 24 Oct 2025 View ↗ PDF BOUNDARY CONDITIONS PLAN-P02 Superseded Plan · 24 Oct 2025 View ↗ PDF MATERIALS STRATEGY PLAN-P01 Superseded Plan · 24 Oct 2025 View ↗ PDF REFUSE STRATEGY PLAN-P02 Superseded Plan · 24 Oct 2025 View ↗ PDF SITE LAYOUT PLAN-P01 Superseded Plan · 24 Oct 2025 View ↗ PDF SECTION LINES KEY PLAN-P01 Current Plan · 24 Oct 2025 View ↗ PDF STREET ELEVATION A-A_ Superseded Plan · 24 Oct 2025 View ↗ PDF STREET ELEVATION B1-B1_P01 Superseded Plan · 24 Oct 2025 View ↗ PDF STREET ELEVATION B2-B2_ Superseded Plan · 24 Oct 2025 View ↗ PDF STREET ELEVATION C-C_ Superseded Plan · 24 Oct 2025 View ↗ PDF STREET ELEVATION D-D_ Superseded Plan · 24 Oct 2025 View ↗ PDF STREET ELEVATION E-E_ Superseded Plan · 24 Oct 2025 View ↗ IMG 3D VISUALISATION - GATEWAY Drawing · 24 Oct 2025 View ↗ IMG 3D VISUALISATION - GATEWAY / TREE LINED STREET Drawing · 24 Oct 2025 View ↗ IMG 3D VISUALISATION - RURAL EDGE EAST 01 Drawing · 24 Oct 2025 View ↗ IMG 3D VISUALISATION - RURAL EDGE WEST Drawing · 24 Oct 2025 View ↗ IMG 3D VISUALISATION - RURAL EDGE SOUTH Drawing · 24 Oct 2025 View ↗ IMG 3D VISUALISATION - THE GREEN 01 Drawing · 24 Oct 2025 View ↗ IMG 3D VISUALISATION - THE GREEN 02 Drawing · 24 Oct 2025 View ↗ PDF ILLUSTRATIVE MASTERPLAN Current Plan · 24 Oct 2025 View ↗ PDF GENERAL ARRANGEMENTS Current Plan · 24 Oct 2025 View ↗ PDF LANDSCAPE MAINTENANCE AND MANAGEMENT PLAN Current Plan · 24 Oct 2025 View ↗ PDF REL(D)-REEDMAKER-LIFE-4B-2S-TYPE 1-ELEVATIONS-DET_P01 Current Plan · 24 Oct 2025 View ↗ PDF TRAVEL PLAN Studies and Reports · 24 Oct 2025 View ↗

Consultation & comments 37

PDF ESSEX FIELD CLUB 1 OF 2 Consultee Comment · 13 Apr 2026 View ↗ PDF ESSEX FIELD CLUB 2 OF 2 Consultee Comment · 13 Apr 2026 View ↗ PDF NATIONAL HIGHWAYS Consultee Comment · 24 Mar 2026 View ↗ PDF ENVIRONMENTAL HEALTH Consultee Comment · 23 Mar 2026 View ↗ PDF NATURAL ENGLAND Consultee Comment · 23 Mar 2026 View ↗ PDF NATIONAL HIGHWAYS Consultee Comment · 26 Feb 2026 View ↗ PDF NATURAL ENGLAND Consultee Comment · 26 Feb 2026 View ↗ PDF THURROCK COUNCIL EDUCATION Consultee Comment · 17 Feb 2026 View ↗ PDF TECHNICAL NOTE TO ADDRESS THE LLFA COMMENTS Studies and Reports · 6 Feb 2026 View ↗ PDF NATIONAL HIGHWAYS Consultee Comment · 27 Jan 2026 View ↗ PDF RESPONSE TO ENVIRONMENTAL HEALTH MEMORANDUM Studies and Reports · 26 Jan 2026 View ↗ PDF CONSULTEE RESPONSE Studies and Reports · 26 Jan 2026 View ↗ PDF NATURAL ENGLAND Consultee Comment · 13 Jan 2026 View ↗ PDF NATURAL ENGLAND Consultee Comment · 13 Jan 2026 View ↗ PDF NATURAL ENGLAND Consultee Comment · 13 Jan 2026 View ↗ PDF ESSEX COUNTY COUNCIL Consultee Comment · 22 Dec 2025 View ↗ PDF TC PUBLIC HEALTH Consultee Comment · 18 Dec 2025 View ↗ PDF NHS MID AND SOUTH ESSEX Consultee Comment · 3 Dec 2025 View ↗ PDF ENVIRONMENTAL HEALTH Consultee Comment · 1 Dec 2025 View ↗ PDF ESSEX WILDLIFE TRUST Consultee Comment · 28 Nov 2025 View ↗ PDF ESSEX FIELD CLUB Consultee Comment · 27 Nov 2025 View ↗ PDF PUBLIC HEALTH Consultee Comment · 26 Nov 2025 View ↗ PDF HIGHWAYS Consultee Comment · 26 Nov 2025 View ↗ PDF EMERGENCY PLANNING Consultee Comment · 25 Nov 2025 View ↗ PDF NATIONAL GAS Consultee Comment · 25 Nov 2025 View ↗ PDF NATURAL ENGLAND Consultee Comment · 25 Nov 2025 View ↗ PDF NATIONAL HIGHWAYS Consultee Comment · 25 Nov 2025 View ↗ PDF ANGLIAN WATER Consultee Comment · 25 Nov 2025 View ↗ PDF BUGLIFE Consultee Comment · 25 Nov 2025 View ↗ PDF LISTED BUILDINGS/CONSERVATION. Consultee Comment · 24 Nov 2025 View ↗ PDF NATIONAL GRID ELECTRICITY TRANSMISSION Consultee Comment · 23 Nov 2025 View ↗ PDF HOUSING DEVELOPMENT Consultee Comment · 18 Nov 2025 View ↗ PDF ESSEX POLICE Consultee Comment · 13 Nov 2025 View ↗ PDF CADENT 2 OF 2 Consultee Comment · 13 Nov 2025 View ↗ PDF CADENT 1 OF 2 Consultee Comment · 13 Nov 2025 View ↗ PDF ESSEX POLICE Consultee Comment · 6 Nov 2025 View ↗ PDF NATIONAL GAS Consultee Comment · 5 Nov 2025 View ↗

All documents on the council site ↗

Site constraints 4

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 163 m away: Lower Thames Crossing
The site is about 163 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Thurrock Flexible Generation Plant (decided, about 1501 m); Tilbury2 (decided, about 1512 m); Norwich to Tilbury (examination closed, recommendation due, about 1695 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Thurrock - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Thurrock
Application type
Full Planning Permission Application
Received
24 Oct 2025
Validated
24 Oct 2025
Ward
OLD Chadwell St Mary
Case officer
Show
Target decision
23 Jan 2026
Decision
Approved
Decision date
21 Sept 2026
Decision level
Committee Decision
Applicant
Show
Agent
Savills

How this decision compares

Decided in 332 days from validation, 275 days slower than Thurrock's median of 57 for new homes. Approved, as 70% of new homes here are.

45%decided within 8 weeks
70%approved
12%go to committee

Plota live figures for new homes decided by Thurrock in the last twelve months, from validation. Thurrock decision record →

Public comments

3comments received
3 objecting

100% object · above the UK average of 74%

56 neighbours consulted · Last counted 11 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
31 Mar 2026
Site or press notice
13 Nov 2025
Committee
14 Apr 2026
Statutory expiry
23 Jan 2026
Env. assessment
No
Thurrock
Planning Authority Score
6/10
Average
#104 of 296 councils
Relevant to this application:
Householder decisions

Thurrock is one of the fastest councils in England for householder decisions, ranking #25 out of 296. Thurrock is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Thurrock decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #252 of 296
82%
Householder approved
Below avg (90%) #271 of 296
84%
Decided in 8 weeks
Above avg (63%) #25 of 296
31%
Extended time limit
Below avg (41%) #62 of 296
65%
Minor dwellings approved
74 decided (1-9 homes)
43%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
43 decided
671
Total decisions
124 refused in the year to March 2026