Chestnut Farm Barns, Low Grounds, Boston, PE20 3PG Data via plota.co.uk

B/26/0311 - Full Planning Permission Awaiting decision

Proposal

Erection of 1no replacement dwelling & change of use of existing agricultural building to domestic ancillary use Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Aug 2026
✓
Validated
14 Aug 2026
✓
Consultation
11 Sept 2026
Decision
Expected by 9 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Oct 2026, from Boston's recent extensions.

The consultation period closed on 2 Oct 2026.

Site constraints 2

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 802 m away: Heckington Fen Solar Park
The site is 802 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Triton Knoll Electrical System (decided, 807 m); Beacon Fen Energy Park (decided, 1002 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £575,000 in July 2022. Other property, freehold.

More than one property is recorded at this address: HM Land Registry does not always give the flat or unit.

28 July 2022£575,000Recorded as a transfer outside a standard sale
26 February 2002£72,000Detached house, new build

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area241 m² (2,594 sq ft)
Energy ratingD (66 out of 100), could reach B
PropertyDetached house, 8 habitable rooms
Built1996 to 2002
HeatingBoiler and radiators, wood chips
WallsSolid brick, as built, insulated (assumed)

From the energy performance certificate lodged in March 2017, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Boston - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Boston
Application type
Full Planning Permission
Postcode
PE20 3PG
Received
6 Aug 2026
Validated
14 Aug 2026
Ward
Swineshead And Holland Fen Ward
Parish
Swineshead
Case officer
Show
Target decision
9 Oct 2026
Applicant
Show
Agent
Andrew Clover Planning And Design Ltd

Decision outlook

Day 56, past Boston's usual 55 days for extensions. 90% are decided within thirteen weeks, so most likely by 13 Nov 2026.

Day 560 days to the 56-day target
67%decided within 8 weeks
95%approved
89decided in the last year

Plota live figures for extensions decided by Boston in the last twelve months, from validation. Boston decision record →

Public comments

No public comments yet.

Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
2 Oct 2026
Site or press notice
11 Sept 2026
Statutory expiry
9 Oct 2026
Env. assessment
No

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.