21 Pearson Close Milton Cambridgeshire CB24 6YS Data via plota.co.uk

Pending 26/03957/HFUL
Date received
around 21 Oct 2026
Date validated
21 Oct 2026
Postcode
CB24 6YS

Description

Installation of an external ground floor Air Conditioning Unit to front elevation. Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision around 15 Dec 2026, from Cambridge's recent utility and infrastructure works.

Day 7 of the 56-day target. Cambridge usually decides utility and infrastructure works by day 55.

Day 749 days to the 56-day target
73%decided within 8 weeks
89%approved
69decided in the last year

Plota live figures for utility and infrastructure works decided by Cambridge in the last twelve months, from validation. Cambridge decision record →

Site constraints 5

National infrastructure project about 739 m away: Cambridge Waste Water Treatment Plant Relocation
The site is about 739 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: A14 Cambridge to Huntingdon Improvement Scheme (decided, about 900 m); East West Rail - Bedford to Cambridge and Western improvements (at pre-application, about 719 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Scheduled monument about 181 m away: Multi-phased settlement east of Milton; Inside the Milton (South Cambridgeshire) built-up area; Green belt about 51 m away: Cambridge; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3

Checked on 27 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 councils
Relevant to this application:
Householder decisions

Cambridge is one of the fastest councils in England for householder decisions, ranking #21 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026