23/03249/CONDA - Condition request Awaiting decision

Proposal

Submission of details required by condition 4 (Brickwork Details) of planning permission Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Oct 2026
✓
Validated
22 Oct 2026
Decision
Expected by 17 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 17 Dec 2026.

Associated applications 3

Site constraints 8

Grade II* listed: Parish Church of All Saints
List entry 1127349 · The pin is inside its outline · 4 more listed buildings within 150 m (4 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
Green belt: Cambridge
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Milton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
National infrastructure project 1030 m away: A14 Cambridge to Huntingdon Improvement Scheme
The site is 1030 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Cambridge Waste Water Treatment Plant Relocation (decided, 1133 m); East West Rail - Bedford to Cambridge and Western improvements (at pre-application, 1133 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Scheduled monument 187 m away: Multi-phased settlement east of Milton; Inside the Milton (South Cambridgeshire) built-up area; Priority habitat 17 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3

Checked on 23 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Cambridgeshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Condition request
Postcode
CB24 6AB
Received
21 Oct 2026
Validated
22 Oct 2026
Ward
Milton & Waterbeach
Case officer
Show
Target decision
17 Dec 2026
Applicant
Show
Agent
All Saints Church

Public comments

No public comments yet.

Last counted 23 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
17 Dec 2026
Env. assessment
No
South Cambridgeshire
Planning Authority Score
8.1/10
Excellent
#25 of 296 councils
Relevant to this application:
Householder decisions

South Cambridgeshire is one of the fastest councils in England for householder decisions, ranking #24 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
South Cambridgeshire decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #45 of 296
95%
Householder approved
Above avg (90%) #91 of 296
84%
Decided in 8 weeks
Above avg (63%) #24 of 296
31%
Extended time limit
Below avg (41%) #60 of 296
86%
Minor dwellings approved
215 decided (1-9 homes)
96%
Major dwellings approved
27 decided (10+ homes)
79%
Change of use approved
38 decided
1,509
Total decisions
96 refused in the year to March 2026