Land to the South of Holbeach Road Spalding Lincolnshire PE12 6JP Data via plota.co.uk

H16-0692-25 Deferred at committee

Deferred at planning committee on 23 September 2026. No decision has been made yet.

Proposal

Development of Site to provide a Food Store and Drive-Thru, along with all Associated Works and Access Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Jul 2025
✓
Validated
22 Jul 2025
✓
Committee
23 Sept 2026
Decision
Not decided yet

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 463.

Planning committee

Deferred by South Holland Planning Committee on 23 Sept 2026.

Deferred

No officer report was published for this decision; this summary is from the committee minutes.

  • No officer recommendation is stated; members sought more clarity on access, retail impact and the neighbouring bungalow’s amenity.
  • The agent supported the application and a resident objected.
  • The committee deferred the application to seek further information.
Read how the committee decided The proposed development, public speakers, members’ concerns and the committee’s decision to defer the application.

Source: Plota analysis of South Holland's committee minutes of 23 Sept 2026.

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 1
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 177 m away: Meridian Solar Farm
The site is about 177 m from the project boundary. Generating station, under examination. Also within 2 km: Grimsby to Walpole (at pre-application, about 13 m); Weston Marsh to East Leicestershire (at pre-application, about 929 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Not green belt · No scheduled monument at the site

Checked on 14 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Holland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
PE12 6JP
Received
16 Jul 2025
Validated
22 Jul 2025
Parish
Spalding
Case officer
Show
Target decision
21 Oct 2025
Applicant
Show
Agent
Savills (UK) Limited Belvedere

Decision outlook

Day 463, past the statutory target. 67% of full applications in South Holland are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 21 Oct 2026.

Day 463407 days past the 56-day target
19%decided within 8 weeks
79%approved
246decided in the last year

Plota live figures for full applications decided by South Holland in the last twelve months, from validation. South Holland decision record →

South Holland
Planning Authority Score
3.6/10
Below average
#216 of 296 councils
Relevant to this application:
Householder decisions

South Holland ranks #170 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Holland decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #260 of 296
89%
Householder approved
Below avg (90%) #210 of 296
62%
Decided in 8 weeks
Below avg (63%) #170 of 296
44%
Extended time limit
Above avg (41%) #185 of 296
63%
Minor dwellings approved
156 decided (1-9 homes)
67%
Major dwellings approved
9 decided (10+ homes)
67%
Change of use approved
12 decided
607
Total decisions
119 refused in the year to March 2026