Marketing Suite 16 Maritime Park Warsash SO31 9EN Data via plota.co.uk

P/26/1158/TO Under Consideration

Proposal

Carry Out Works To Tree Protected By Tpo - Holm Oak: Crown Lift To 6M And Remove 2 Lowest Branches To Fence Line. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Oct 2026
Decision
Expected by 13 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 31 Oct 2026 and 8 Nov 2026, from Fareham's recent tree and landscaping works.

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
Hovercraft. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Special protection area 104 m away: Hook With Warsash
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 106 m away: Lee-on-The Solent to Itchen Estuary SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
1 listed building within 150 m; Inside the Locks Heath built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 21 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area151 m² (1,625 sq ft)
Energy ratingB (81 out of 100)
PropertyDetached house
Built2024
HeatingAir source heat pump, underfloor, electric
WallsAverage thermal transmittance 0.17 W/m²K

From the energy performance certificate lodged in September 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Fareham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Fareham
Postcode
SO31 9EN
Received
18 Oct 2026
Validated
18 Oct 2026
Ward
Hook-with-Warsash
Case officer
Show
Target decision
13 Dec 2026
Applicant
Show
Agent
Alan Brind Tree Services ltd

Decision outlook

Day 11 of the 56-day target. Fareham usually decides tree and landscaping works by day 17.

Day 1145 days to the 56-day target
100%decided within 8 weeks
95%approved
136decided in the last year

Plota live figures for tree and landscaping works decided by Fareham in the last twelve months, from validation. Fareham decision record →

Fareham
Planning Authority Score
9.5/10
Excellent
#1 of 296 councils
Relevant to this application:
Householder decisions

Fareham is one of the fastest councils in England for householder decisions, ranking #18 out of 296. Only 22% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Fareham decision statistics
Based on MHCLG data, the year to March 2026
98%
Overall approval rate
Above avg (87%) #1 of 296
99%
Householder approved
Above avg (90%) #3 of 296
89%
Decided in 8 weeks
Above avg (63%) #18 of 296
22%
Extended time limit
Below avg (41%) #23 of 296
86%
Minor dwellings approved
50 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
91%
Change of use approved
23 decided
583
Total decisions
14 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.