140 Aldersgate Street London EC1A 4HY Data via plota.co.uk

26/00748/FULMAJ - Full Major Application Under Consideration

Proposal

Extensions to the existing building, involving the partial demolition and construction at Levels 7 and 8 to provide additional office floorspace (Use Class E (g)(i)), including alterations to the external amenity terrace at Level 3, new rooftop plant, alterations to the lower levels including the provision of retail (Use Class E (a/b)) at ground floor level and flexible office / retail floorspace (Class E (a/b/g(i)) at lower ground floor level (basement 1), relocation of the primary building entrance, elevational alterations, re-provision of a public toilet and all associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 May 2026
✓
Validated
29 May 2026
✓
Consultation
3 Jun 2026
Decision
Target date was 28 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 1 Sept 2026; it is now day 153.

The consultation period closed on 1 Sept 2026.

Documents 121

Statements & assessments 37

PDF AIR QUALITY ASSESSMENT Accompanying report · 24 Jun 2026 View ↗ PDF COMMENTS - TRANSPORT FOR LONDON Consultee Comment · 19 Jun 2026 View ↗ PDF DESIGN & ACCESS STATEMENT - CHAPTER 01 Report - Design & Access Statement/Report · 29 May 2026 View ↗ PDF DESIGN & ACCESS STATEMENT - CHAPTER 16 Report - Design & Access Statement/Report · 29 May 2026 View ↗ PDF 140 ALDERSGATE ACOUSTIC REPORT Report - Acoustic/Noise Report · 22 May 2026 View ↗ PDF 140 ALDERSGATE FIRE STATEMENT Other · 22 May 2026 View ↗ PDF 140 ALDERSGATE FLOOD RISK ASSESSMENT Accompanying report · 22 May 2026 View ↗ PDF 140 ALDERSGATE DSMP Report - Transport Statement/Report · 22 May 2026 View ↗ PDF 140 ALDERSGATE ECOLOGY APPRAISAL Accompanying report · 22 May 2026 View ↗ PDF 140 ALDERSGATE EQUALITY IMPACT ASSESSMENT Accompanying report · 22 May 2026 View ↗ PDF 140 ALDERSGATE DRAINAGE REPORT Accompanying report · 22 May 2026 View ↗ PDF 140 ALDERSGATE PS APPENDIX 2 PLANNING POLICY AUDIT. Report - Planning Statement/Report · 22 May 2026 View ↗ PDF 140 ALDERSGATE HEALTH IMPACT ASSESSMENT Accompanying report · 22 May 2026 View ↗ PDF 140 ALDERSGATE TRANSPORT ASSESSMENT PART 2 Report - Transport Statement/Report · 22 May 2026 View ↗ PDF 140 ALDERSGATE TRANSPORT ASSESSMENT PART 3 Report - Transport Statement/Report · 22 May 2026 View ↗ PDF 140 ALDERSGATE SUSTAINABILITY STMNT Accompanying report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 02 Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 04 Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 05 Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 06 Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 07 (PART 1 OF 3) Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 07 (PART 2 OF 3) Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 07 (PART 3 OF 3) Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 08 Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 09 Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 10 Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 12 (PART 2 OF 2) Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 13 Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 14 Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 15 Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 03_COMPRESSED Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 140 ALDERSGATE PLANNING STATEMENT Report - Planning Statement/Report · 22 May 2026 View ↗ PDF 140 ALDERSGATE UTILITIES STATEMENT Accompanying report · 22 May 2026 View ↗ PDF 140 ALDERSGATE WIND MICROCLIMATE ASSESSMENT Accompanying report · 22 May 2026 View ↗ PDF 140 ALDERSGATE TRANSPORT ASSESSMENT PART 1 Report - Transport Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 11 Report - Design & Access Statement/Report · 22 May 2026 View ↗ PDF 260515_GENSLER_DESIGNACCESSSTATEMENT_CHAPTER 12 (PART 1 OF 2) Report - Design & Access Statement/Report · 22 May 2026 View ↗

Plans & drawings 64

PDF PROPOSED PLAN - LEVEL 00 Drawing · 23 Jun 2026 View ↗ PDF INDOOR AIR QUALITY PLAN Accompanying report · 11 Jun 2026 View ↗ PDF GA WEST ELEVATION Drawing · 29 May 2026 View ↗ PDF 140 ALDERSGATE TRAVEL PLAN - PART 1 OF 3 Report - Travel Plan · 22 May 2026 View ↗ PDF 140 ALDERSGATE TRAVEL PLAN - PART 2 OF 3 Report - Travel Plan · 22 May 2026 View ↗ PDF 140 ALDERSGATE TRAVEL PLAN - PART 3 OF 3 Report - Travel Plan · 22 May 2026 View ↗ PDF LVL 3 LANDSCAPE PLAN Other · 22 May 2026 View ↗ PDF ROOF LANDSCAPE PLAN Other · 22 May 2026 View ↗ PDF DECONSTRUCTION PLAN - LEVEL 08 Drawing · 22 May 2026 View ↗ PDF PROPOSED PLAN - LEVEL B1 Drawing · 22 May 2026 View ↗ PDF EXISTING PLAN - LEVEL 00 Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION PLAN - LEVEL 00 Drawing · 22 May 2026 View ↗ PDF PROPOSED PLAN - LEVEL 02 Drawing · 22 May 2026 View ↗ PDF EXISTING PLAN - LEVEL 02 Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION PLAN - LEVEL 02 Drawing · 22 May 2026 View ↗ PDF PROPOSED PLAN - LEVEL 03 Drawing · 22 May 2026 View ↗ PDF EXISTING PLAN - LEVEL 03 Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION PLAN - LEVEL 03 Drawing · 22 May 2026 View ↗ PDF PROPOSED PLAN - LEVEL 04 Drawing · 22 May 2026 View ↗ PDF EXISTING PLAN - LEVEL 04 Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION PLAN - LEVEL 04 Drawing · 22 May 2026 View ↗ PDF PROPOSED PLAN - LEVEL 05 Drawing · 22 May 2026 View ↗ PDF EXISTING PLAN - LEVEL 05 Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION PLAN - LEVEL 05 Drawing · 22 May 2026 View ↗ PDF PROPOSED PLAN - LEVEL 06 Drawing · 22 May 2026 View ↗ PDF EXISTING PLAN - LEVEL 06 Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION PLAN - LEVEL 06 Drawing · 22 May 2026 View ↗ PDF PROPOSED PLAN - LEVEL 07 Drawing · 22 May 2026 View ↗ PDF EXISTING PLAN - LEVEL 07 Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION PLAN - LEVEL 07 Drawing · 22 May 2026 View ↗ PDF PROPOSED PLAN - LEVEL 08 Drawing · 22 May 2026 View ↗ PDF EXISTING PLAN - LEVEL 08 Drawing · 22 May 2026 View ↗ PDF EXISTING PLAN - LEVEL B1 Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION PLAN - LEVEL B1 Drawing · 22 May 2026 View ↗ PDF PROPOSED PLAN - LEVEL B2 Drawing · 22 May 2026 View ↗ PDF EXISTING PLAN - LEVEL B2 Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION PLAN - LEVEL B2 Drawing · 22 May 2026 View ↗ PDF PROPOSED PLAN - LEVEL R1 Drawing · 22 May 2026 View ↗ PDF PROPOSED PLAN - LEVEL R2 Drawing · 22 May 2026 View ↗ PDF EXISTING PLAN - LEVEL RF Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION PLAN - LEVEL RF Drawing · 22 May 2026 View ↗ PDF GA EAST ELEVATION Drawing · 22 May 2026 View ↗ PDF EXISTING EAST ELEVATION Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION EAST ELEVATION Drawing · 22 May 2026 View ↗ PDF GA NORTH ELEVATION Drawing · 22 May 2026 View ↗ PDF EXISTING NORTH ELEVATION Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION NORTH ELEVATION Drawing · 22 May 2026 View ↗ PDF EXISTING WEST ELEVATION Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION WEST ELEVATION Drawing · 22 May 2026 View ↗ PDF GA SECTION AA Drawing · 22 May 2026 View ↗ PDF EXISTING SECTION AA Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION SECTION AA Drawing · 22 May 2026 View ↗ PDF GA SECTION BB Drawing · 22 May 2026 View ↗ PDF EXISTING SECTION BB Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION SECTION BB Drawing · 22 May 2026 View ↗ PDF GA SECTION CC Drawing · 22 May 2026 View ↗ PDF EXISTING SECTION CC Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION SECTION CC Drawing · 22 May 2026 View ↗ PDF 140ALD-GEN-XX-XX-L-A-DIR000 Drawings Schedule · 22 May 2026 View ↗ PDF 140ALD-GEN-ZZ-00-D-A-020110 Site Plan · 22 May 2026 View ↗ PDF KEY LOCATION PLAN Site Plan · 22 May 2026 View ↗ PDF PROPOSED PLAN - LEVEL 01 Drawing · 22 May 2026 View ↗ PDF EXISTING PLAN - LEVEL 01 Drawing · 22 May 2026 View ↗ PDF DECONSTRUCTION PLAN - LEVEL 01 Drawing · 22 May 2026 View ↗

All documents on the council site ↗

Site constraints 11

Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Registered park or garden about 29 m away: The Barbican
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
9 listed buildings within 150 m of the postcode pin
Nearest: Barbican, Grade II, about 29 m from the postcode pin · 1 Grade I, 8 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 9 with distances
Historic England ↗
National infrastructure project about 685 m away: Thames Tideway Tunnel
The site is about 685 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 553 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Conservation area about 26 m away: Smithfield; Scheduled monument about 218 m away: London Wall: section of Roman and medieval wall and bastions, west and north of Monkwell Square; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space about 29 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area10,957 m² (117,940 sq ft)
Energy ratingD (asset rating 98)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in November 2019, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Major Application
Postcode
EC1A 4HY
Received
22 May 2026
Validated
29 May 2026
Ward
Farringdon Within
Case officer
Show
Target decision
28 Aug 2026
Decision level
Delegated
Applicant
Show
Agent
DP9
Leaseholder
Show

Decision outlook

Day 153, past the statutory target. 68% of extensions in City of London are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 28 Oct 2026.

Day 15397 days past the 56-day target
31%decided within 8 weeks
100%approved
116decided in the last year

Plota live figures for extensions decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

5comments received
2 objecting1 neutral2 supporting

40% support · above the UK average of 16%

Last counted 28 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14894735
Planning Portal ref
PP-14894735
Neighbours
11 Aug 2026
Consultation
3 Jun 2026
Comments by
1 Sept 2026
Site or press notice
5 Jun 2026
Statutory expiry
28 Aug 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 councils
Relevant to this application:
Major dwellings

City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 296. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026