Pine Ridge Holiday Park Napier Road Poole BH15 4LZ Data via plota.co.uk

Pending P/26/02960/TTPO
Council
Date received
22 Jun 2026
Date validated
22 Jun 2026
Postcode
BH15 4LZ

Description

T1a- cherry. (28 pine ridge) reduce lateral growth over no.28 by 1.5m from the tips inwards. T2- Scots pine. (18 The Meadows)- prune to provide a 2m clearance from the fabric of the buildings by removal of secondary branches only T3-Common Alder. (Rockley Vale 33) Crown lift to 4m from ground level by removal of secondary branches only. Reduce lateral spread over grass area by 2m from the tips inwards. T4-Goat Willow (Rockley Vale 33) reduce to finished height in line with hedge. T5-Goat Willow (Rockley Vale 33) Re-pollard to previous pollard points at approx. 3.5m from ground level. (as part of cyclical tree maintenance) G6- Leyland Cypress (Purbeck View 38, 50, 62) reduce lateral spread growing over caravans 30, 50 and 62 by 2.5m from the tips inwards. G1- Mixed species- including oak, silver birch and pine. Reduce height by 3m of all trees on western aspect of pine ridge in-between caravans 18-12. Data via plota.co.uk

BCP
Planning Authority Score
1.5/10
Poor
#281 of 292 councils
Relevant to this application:
Householder decisions

BCP is one of the slowest councils in England for householder decisions, ranking #271 out of 292. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
BCP decision performance
Based on MHCLG data, 2025
83%
Overall approval rate
Below avg (87%) #229 of 292
89%
Householder approved
Below avg (90%) #198 of 292
38%
Decided in 8 weeks
Below avg (64%) #271 of 292
63%
Extended time limit
Above avg (40%) #272 of 292
64%
Minor dwellings approved
321 decided (1-9 homes)
67%
Major dwellings approved
51 decided (10+ homes)
84%
Change of use approved
77 decided
2,150
Total decisions
360 refused in 2025