Land At Mount Lane Springwell Gateshead Data via plota.co.uk

25/02953/BGP - Biodiversity Gain Condition Approved

Proposal

Discharge of Biodiversity Gain Plan condition (controlled under Schedule 7A of the Town and Country Planning Act 1990 (as amended)) relating to planning application Ref: . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Dec 2025
✓
Consultation
2 Jan 2026
✓
Approved
19 Feb 2026
✗
Appeal dismissed
28 May 2026

Approved on 19 Feb 2026 · Delegated Decision · Last checked 3 Oct 2026

Site constraints 8

Green belt: Tyne and Wear
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 873 m away: A1 Birtley to Coal House Improvement Scheme
The site is 873 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Scheduled monument 185 m away: Bowes Railway; Radon affected area, class 2; Coalfield, development low risk area; Inside the Gateshead built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sunderland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sunderland
Application type
Biodiversity Gain Condition
Received
23 Dec 2025
Validated
23 Dec 2025
Ward
Washington West
Case officer
Show
Target decision
20 Feb 2026
Decision
Approved
Decision date
19 Feb 2026
Decision level
Delegated Decision
Appeal
Dismissed · 28 May 2026 · Written Representations · Inspectorate case 6005234 ↗
Applicant
Show
Agent
Lichfields

How this decision compares

Decided in 58 days from validation, 12 days slower than Sunderland's median of 46 for other. Approved, as 83% of other here are.

67%decided within 8 weeks
83%approved
23%go to committee

Plota live figures for other decided by Sunderland in the last twelve months, from validation. Sunderland decision record →

Public comments

No public comments yet.

Last counted 3 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14541746
Planning Portal ref
PP-14541746
Consultation
2 Jan 2026
Comments by
23 Jan 2026
Statutory expiry
20 Feb 2026
Env. assessment
No
Sunderland
Planning Authority Score
6.2/10
Average
#94 of 296 councils
Relevant to this application:
Householder decisions

Sunderland ranks #99 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Sunderland decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #101 of 296
94%
Householder approved
Above avg (90%) #119 of 296
73%
Decided in 8 weeks
Above avg (63%) #99 of 296
37%
Extended time limit
Below avg (41%) #123 of 296
85%
Minor dwellings approved
34 decided (1-9 homes)
84%
Major dwellings approved
19 decided (10+ homes)
66%
Change of use approved
58 decided
581
Total decisions
54 refused in the year to March 2026