Silverlands 63 West Moors Road West Moors BH22 0QW Data via plota.co.uk

P/TRT/2026/04948 - Tree Works- TPO Approved

Proposal

T18 Oak, - Crown lift to give a 5-metres clearance from ground., - Reduce laterals growing towards the building by 2-3 metres., - Reduce overextended lateral branches by 2-3 metres to shape and balance the crown. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Sept 2026
✓
Approved
30 Sept 2026

Approved on 30 Sept 2026 · Delegated · Last checked 5 Oct 2026

Site constraints 7

Green belt: South West Hampshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
National infrastructure project: Navitus Bay Wind Park
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Special area of conservation 384 m away: Dorset Heaths; SSSI 384 m away: Holt and West Moors Heaths SSSI; Inside the West Moors built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Tree Works- TPO
Postcode
BH22 0QW
Received
4 Sept 2026
Validated
4 Sept 2026
Ward
West Moors and Three Legged Cross Ward
Parish
West Moors
Case officer
Show
Decision
Tree Works - TPO - Consent
Decision date
30 Sept 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 26 days from validation, about the council's usual 26 days. Approved, as 94% of tree and landscaping works here are.

99%decided within 8 weeks
94%approved
2,272decided in the last year

Plota live figures for tree and landscaping works decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
29 Sept 2026
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 councils
Relevant to this application:
Householder decisions

Dorset is faster than most councils at deciding householder applications, ranking #51 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026