Old Oak Common Lane, London, NW10 6DZ Data via plota.co.uk
Proposal
Application under Schedule 17 of the High Speed Rail (London - West Midlands) Act 2017 (as amended) for a non-material change to planning consent reference dated 20/01/2021, in relation to amendments to the Central Line Bridge comprising extension and realignment of the wingwalls, metal bird mesh to the west abutment, drainage edge beam upstands to the bridge deck and guardrails and fencing. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. A decision is expected by 6 Dec 2026.
Associated applications 2
Part of
- AmendmentApplication under Schedule 17 of the High Speed Rail (London - West Midlands) Act 2017 (as…This application26/0180/HS2OPDC
Site constraints 7
Checked on 22 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Old Oak Park Royal - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Railway lands at Old Oak Common, Old Oak Common Lane, London, NW10 6DZ
Application under Schedule 17 of the High Speed Rail (London - West Midlands) Ac...
Stairs (between Nos. 49 and 51 Wells House Road) connecting Wells House Road and Old Oak Common Lane, London, NW10 6ED
Application under Schedule 17 of the High Speed Rail (London-West Midlands) Act ...
Nearby new applications
52 Mellitus Street, London, W12 0AS
Erection of a rear dormer roof extension (approved under ref: P/2026/01453/FUL);...
Unit 5, Apex Industrial Estate, 20-22 Hythe Road, London, NW10 6RT
Discharge of condition 3 (Cycle Parking Details) pursuant to planning permission...
Railway lands at Old Oak Common, Old Oak Common Lane, London, NW10 6DZ
Application under Schedule 17 of the High Speed Rail (London - West Midlands) Ac...
Unit 5,Apex Industrial Estate, 20-22 Hythe Road, London NW10 6RT
Discharge of condition 4 (Delivery and Servicing Plan) pursuant to planning perm...
Unit 5, Apex Industrial Estate, 20-22 Hythe Road, London, NW10 6RT
Discharge of condition 4 (Delivery and Servicing Plan) pursuant to planning perm...
81 - 98 Shaftesbury Gardens Park Royal NW10 6LL
Replacement of existing single glazed timber casement windows with double glazed...
Important details
- Council
- Old Oak Park Royal
- Application type
- HS2 approval request
- Postcode
- NW10 6DZ
- Received
- 12 Oct 2026
- Case officer
- Show
- Target decision
- 6 Dec 2026
- Decision level
- Delegated to Director of Planning
- Applicant
- Show
- Agent
- Balfour Beatty Vinci Systra joint venture
Consultation & key dates
- Alt. reference
- PP-15289174
Historical activity at this location
16 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Track this application
Old Oak Common Lane, London, NW10 6DZ
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Referenced application
Council archive
Old Oak Common Lane, London, NW10 6DZ
Application under Schedule 17 of the High Speed Rail (London – West Midlands) Act 2017 relating to works associated with the realignment of Oak Common Lane and replacement Great Western Mainline and Central Line bridges.
- Received
- 23 Jan 2020
- Outcome
- Pending