Rose House Bungalow High Levels Bank Thorne Doncaster DN8 5SH Data via plota.co.uk

26/01432/FUL - Full Application Awaiting decision

Proposal

Demolish existing farmhouse and erect a bungalow, improvements to form buildings for pig rearing (without compliance with condition 3 of planning application TH.4452, granted on 27/08/1970; Agricultural tie condition) - DRAFT Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
30 Jul 2026
Validated
9 Sept 2026
Decision
Expected by 4 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 31 Oct 2026, from Doncaster's recent demolitions.

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Nature improvement area: Humberhead Levels.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Doncaster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Doncaster
Application type
Full Application
Postcode
DN8 5SH
Received
30 Jul 2026
Validated
9 Sept 2026
Ward
Thorne And Moorends
Parish
Thorne Town Council
Case officer
Show
Target decision
4 Nov 2026
Applicant
Show
Agent
Centreline Design Consulting Ltd

Decision outlook

Day 4 of the 56-day target. Doncaster usually decides demolitions by day 52.

Day 452 days to the 56-day target
79%decided within 8 weeks
87%approved
113decided in the last year

Plota live figures for demolitions decided by Doncaster in the last twelve months, from validation. Doncaster decision record →

Public comments

No public comments yet.

Last counted 11 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15068599
Statutory expiry
4 Nov 2026
Env. assessment
No
Doncaster
Planning Authority Score
7.7/10
Good
#36 of 296 councils
Relevant to this application:
Householder decisions

Doncaster is one of the fastest councils in England for householder decisions, ranking #27 out of 296. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Doncaster decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #169 of 296
94%
Householder approved
Above avg (90%) #103 of 296
83%
Decided in 8 weeks
Above avg (63%) #27 of 296
33%
Extended time limit
Below avg (41%) #75 of 296
67%
Minor dwellings approved
135 decided (1-9 homes)
93%
Major dwellings approved
27 decided (10+ homes)
90%
Change of use approved
48 decided
928
Total decisions
122 refused in the year to March 2026