Street Record, Beresford Avenue, Wembley Data via plota.co.uk

26/0059/TELN - Tel Notification Awaiting decision

Proposal

Telecommunications notification for Proposed Substation Site at Relocate TBS Connection, Northfields TBS Substation, Beresford Avenue, Wembley, HA0 1NW (The Town & Country Planning (General Permitted Development) (England) Order 2015) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Aug 2026
Decision
Target date was 30 Aug 2026

As of 11 Sept 2026, the council is no longer showing this application on their planning portal. It may have been withdrawn or re-listed under a different reference. We've stopped checking it for updates.

Site constraints 5

Article 4 direction
Article 4 for HMOs. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Brent AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Inside the Brent built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square; Designated open space about 32 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brent - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Brent
Application type
Tel Notification
Received
27 Aug 2026
Validated
27 Aug 2026
Ward
Alperton
Case officer
Show
Target decision
30 Aug 2026
Decision level
Delegated Team Manager
Applicant
Show
Agent
UK Power Networks

Decision outlook

Day 63, past the statutory target. 93% of utility and infrastructure works in Brent are decided within thirteen weeks, which runs to 26 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 3 Sept 2026.

Day 637 days past the 56-day target
77%decided within 8 weeks
82%approved
61decided in the last year

Plota live figures for utility and infrastructure works decided by Brent in the last twelve months, from validation. Brent decision record →

Public comments

No public comments yet.

Last counted 3 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Brent
Planning Authority Score
5.7/10
Average
#113 of 296 councils
Relevant to this application:
Householder decisions

Brent is faster than most councils at deciding householder applications, ranking #91 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brent decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #269 of 296
85%
Householder approved
Below avg (90%) #247 of 296
73%
Decided in 8 weeks
Above avg (63%) #91 of 296
28%
Extended time limit
Below avg (41%) #42 of 296
53%
Minor dwellings approved
73 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
54%
Change of use approved
193 decided
1,963
Total decisions
431 refused in the year to March 2026