St Wilfrids Church Town Gate Calverley Pudsey LS28 5NF Data via plota.co.uk

26/05945/TR - Tree Works Current

Proposal

Goat willow tree - Removal of branch. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 21 Oct 2026
Decision
Expected by 28 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 6 Nov 2026 and 21 Nov 2026, from Leeds's recent tree and landscaping works.

Site constraints 9

Calverley conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Public footpath about 20 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
6 listed buildings within 150 m of the postcode pin
Nearest: Thornhill Arms, Grade II, about 53 m from the postcode pin · 2 Grade II*, 4 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 6 with distances
Historic England ↗
Also on the record
Radon affected area, class 3; National infrastructure project: Calderdale Energy Park, at pre-application; Coalfield, development low risk area; Inside the Calverley built-up area; Green belt about 20 m away: South and West Yorkshire.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 23 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Leeds - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Leeds
Application type
Tree Works
Postcode
LS28 5NF
Received
around 21 Oct 2026
Validated
21 Oct 2026
Ward
Calverley & Farsley
Target decision
28 Nov 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 7 of the 56-day target. Leeds usually decides tree and landscaping works by day 24.

Day 749 days to the 56-day target
96%decided within 8 weeks
90%approved
865decided in the last year

Plota live figures for tree and landscaping works decided by Leeds in the last twelve months, from validation. Leeds decision record →

Public comments

No public comments yet.

Last counted 23 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
28 Nov 2026
Env. assessment
No
Leeds
Planning Authority Score
5.3/10
Average
#131 of 296 councils
Relevant to this application:
Householder decisions

Leeds is faster than most councils at deciding householder applications, ranking #95 out of 296. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Leeds decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #238 of 296
85%
Householder approved
Below avg (90%) #249 of 296
73%
Decided in 8 weeks
Above avg (63%) #95 of 296
33%
Extended time limit
Below avg (41%) #78 of 296
70%
Minor dwellings approved
208 decided (1-9 homes)
86%
Major dwellings approved
36 decided (10+ homes)
68%
Change of use approved
279 decided
3,681
Total decisions
613 refused in the year to March 2026