Devon House Devon House Drive Bovey Tracey Devon TQ13 9HB Data via plota.co.uk

26/01370/TPO - Tree Preservation Order Pending Consideration

Proposal

T1 Cedar - Prune back branches by up to 1.5m back to pruning points. Crown lift to achieve 2m clearance. G2 Sweet Chestnut Avenue - Prune away from driveway entrance, shortening branches by 2m. Crown lift above drive way to achieve a 5m clearance from ground level T3 Copper Beech - Crown lift above lawn to achieve 2m clearance from ground level, to get clearance above lawn. Crown lift above drive way to achieve a 5m clearance from ground level T4 Evergreen Oak - Crown lift above drive way to achieve a 5m clearance from ground level Remove any deadwood… Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
1 Sept 2026
Decision
Expected by 27 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 13 Oct 2026 and 23 Oct 2026, from Teignbridge's recent tree and landscaping works.

Site constraints 4

Grade II listed: Devon House Flats
List entry 1097430 · 27 m from the pin · 1 more listed building within 150 m (1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other one with distances
Historic England ↗
Also on the record
Inside the Bovey Tracey built-up area; Conservation area 97 m away: Bovey Tracey Town Centre and Mary Street; the 1970s provisional farmland map had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Teignbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Preservation Order
Postcode
TQ13 9HB
Received
1 Sept 2026
Validated
1 Sept 2026
Ward
Bovey
Parish
BOVEY TRACEY
Case officer
Show
Target decision
27 Oct 2026
Applicant
Show
Agent
Kneebone Trees LTD

Decision outlook

Day 12 of the 56-day target. Teignbridge usually decides tree and landscaping works by day 46.

Day 1244 days to the 56-day target
91%decided within 8 weeks
94%approved
174decided in the last year

Plota live figures for tree and landscaping works decided by Teignbridge in the last twelve months, from validation. Teignbridge decision record →

Public comments

No public comments yet.

Last counted 9 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
E2/08/03
Statutory expiry
27 Oct 2026
Env. assessment
No
Teignbridge
Planning Authority Score
6.1/10
Average
#102 of 296 councils
Relevant to this application:
Householder decisions

Teignbridge is faster than most councils at deciding householder applications, ranking #39 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Teignbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Teignbridge decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #262 of 296
82%
Householder approved
Below avg (90%) #270 of 296
80%
Decided in 8 weeks
Above avg (63%) #39 of 296
26%
Extended time limit
Below avg (41%) #37 of 296
60%
Minor dwellings approved
83 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
69%
Change of use approved
13 decided
716
Total decisions
141 refused in the year to March 2026