Torre Abbey The Kings Drive Torquay TQ2 5JE Data via plota.co.uk

P/2026/0555 - Listed Building Consent Pending

Proposal

Repair of West Range roof and chapel interior, tower roof repair, strengthen store room floor and small scale patch repairs in ancillary areas to specified lime-plastered walls. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
4 Sept 2026
Consultation
17 Sept 2026
Decision
Expected by 30 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 12 Nov 2026, from Torbay's recent listed building consent. Comments are open until 8 Oct 2026.

Comment on this application ↗

Site constraints 5

Scheduled monument: Torre Abbey
Scheduled monument consent is needed for any work to it, separate from planning permission.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Grade I listed: Torre Abbey
List entry 1206852 · 2 m from the pin · 6 more listed buildings within 150 m (1 Grade I, 5 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 6 with distances
Historic England ↗
Belgravia conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Special area of conservation 356 m away: Lyme Bay and Torbay; Inside the Torquay built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Torbay - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Torbay
Application type
Listed Building Consent
Postcode
TQ2 5JE
Received
4 Sept 2026
Validated
4 Sept 2026
Ward
Tormohun
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Architecton

Decision outlook

Day 10 of the 56-day target. Torbay usually decides listed building consent by day 69.

Day 1059 days to the predicted decision (day 69)
10%decided within 8 weeks
80%approved
10%go to committee

Plota live figures for listed building consent decided by Torbay in the last twelve months, from validation. Torbay decision record →

Public comments

No public comments yet.

Last counted 9 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15201464
Comments by
8 Oct 2026
Site or press notice
17 Sept 2026
Env. assessment
No
Torbay
Planning Authority Score
1.9/10
Poor
#276 of 296 councils
Relevant to this application:
Other decisions

Torbay is one of the slowest councils in England for householder decisions, ranking #276 out of 296. 54% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Torbay decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #183 of 296
90%
Householder approved
Above avg (90%) #197 of 296
37%
Decided in 8 weeks
Below avg (63%) #276 of 296
54%
Extended time limit
Above avg (41%) #247 of 296
81%
Minor dwellings approved
53 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
91%
Change of use approved
44 decided
529
Total decisions
68 refused in the year to March 2026