Ymddiredolaeth Taliesyn Cyf, Tŷ Newydd Writers Centre, TŶ NEWYDD, Llanystumdwy, Criccieth, Gwynedd, LL52 0LW Data via plota.co.uk

C26/0496/41/CR - Listed Building Consent In Progress

Proposal

Ychwanegu gwaith cryfhau strwythurol i'r to uwchben y llyfrgell ac amnewid platiau wal yr ystafell / To reinstate structural support to a modified roof truss located within the roof space above the library room as well as replacement of wall plates supporting the library ceiling. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Aug 2026
✓
Validated
14 Aug 2026
Decision
Expected by 9 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 23 Oct 2026 and 1 Dec 2026, from Gwynedd's recent extensions.

The consultation period closed on 21 Sept 2026.

Site constraints 2

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 3.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gwynedd - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gwynedd
Application type
Listed Building Consent
Postcode
LL52 0LW
Received
13 Aug 2026
Validated
14 Aug 2026
Ward
Llanystumdwy
Parish
Llanystumdwy
Case officer
Show
Target decision
9 Oct 2026
Decision level
Dirprwyedig / Delegated
Applicant
Show
Agent
PegwA

Decision outlook

Day 56 of the 56-day target. Gwynedd usually decides extensions by day 85.

Day 5629 days to the predicted decision (day 85)
28%decided within 8 weeks
94%approved
248decided in the last year

Plota live figures for extensions decided by Gwynedd in the last twelve months, from validation. Gwynedd decision record →

Consultation & key dates

Comments by
21 Sept 2026
Statutory expiry
9 Oct 2026