594 A Fulham Road, London, SW6 5NT Data via plota.co.uk

P/2026/02205/NMAT - Non-Material Amendment Submission Approved

Proposal

Non-material amendment to planning permission ref: granted 4th March 2025 for the 'Formation of a lightwell to the side elevation, in connection with the existing basement; increase in the floorspace at basement level by utilising ancillary floorspace from the rear part of commercial units No. 592 and No. 594 Fulham Road; installation of 1no. rooflight to the existing front roof slope; installation of 2no. rooflights to the existing side roofslope; installation of a new window to the side elevation at ground floor level.' Amendments sought to include: Repositioning of approved sash window and flood door within the basement lightwell foyer elevation; alteration of lightwell window from vertical to horizontal; introduction of a permanently fixed escape ladder within the lightwell, securely mounted to the retaining wall; installation of a new opening to the approved metal railing on the Kelvedon Road frontage; increase to size of lightwell. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Aug 2026
✓
Validated
25 Aug 2026
✓
Approved
9 Oct 2026

Approved on 9 Oct 2026 · Last checked 10 Oct 2026

Associated applications 2

  • Part of

    Fullcouncil archive
    • AmendmentNon-material amendmentThis applicationP/2026/02205/NMAT

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Protected view corridor: 9A.1 King Henry's Mound to St Paul's Cathedral
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 863 m away: Thames Tideway Tunnel
The site is 863 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
2 listed buildings within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area57 m² (614 sq ft)
Energy ratingD (asset rating 84)
UseRetail/Financial and Professional Services
HeatingAir Conditioning

From the energy performance certificate lodged in January 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-Material Amendment Submission
Postcode
SW6 5NT
Received
24 Aug 2026
Validated
25 Aug 2026
Ward
Walham Green
Case officer
Show
Decision
APPLICATION APPROVED
Decision date
9 Oct 2026
Applicant
Show

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
25 Aug 2026
Statutory expiry
22 Sept 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.