Gorse Farm Rock Lane Tockholes Darwen BB3 0LX Data via plota.co.uk

10/25/1245 - Full Planning Application Approved

Proposal

Single storey rear extension, creation of patio area with pergola and single storey porch extension to front Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Nov 2025
✓
Validated
26 Nov 2025
✓
Approved
5 Jan 2026

Approved on 5 Jan 2026 · Delegated · Last checked 19 Oct 2026

Site constraints 8

Green belt: Merseyside and Greater Manchester
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
5 listed buildings within 150 m
Nearest: St Stephen's Old School in St Stephen's Churchyard, Grade II, 39 m away · 5 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 5 with distances
Historic England ↗
Also on the record
Public footpath 30 m away; Radon affected area, class 3; Coalfield, development low risk area; Priority habitat 20 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Blackburn - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Blackburn
Application type
Full Planning Application
Postcode
BB3 0LX
Received
25 Nov 2025
Validated
26 Nov 2025
Ward
Darwen West
Parish
Blackburn
Case officer
Show
Target decision
21 Jan 2026
Decision
PERMITS
Decision date
5 Jan 2026
Decision level
Delegated
Applicant
Show
Agent
Architectural Designworks Limited

How this decision compares

Decided in 40 days from validation, 13 days faster than Blackburn's median of 53 for extensions. Approved, as 99% of extensions here are.

70%decided within 8 weeks
99%approved
402decided in the last year

Plota live figures for extensions decided by Blackburn in the last twelve months, from validation. Blackburn decision record →

Consultation & key dates

Statutory expiry
21 Jan 2026
Blackburn
Planning Authority Score
7.2/10
Good
#55 of 296 councils
Relevant to this application:
Householder decisions

Blackburn is faster than most councils at deciding householder applications, ranking #90 out of 296. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Blackburn decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #7 of 296
98%
Householder approved
Above avg (90%) #10 of 296
73%
Decided in 8 weeks
Above avg (63%) #90 of 296
40%
Extended time limit
Below avg (41%) #147 of 296
88%
Minor dwellings approved
40 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
56 decided
519
Total decisions
23 refused in the year to March 2026