The Green Quarter The Straight Southall UB1 1QZ Data via plota.co.uk

254476NMA - Non-Material Amendment Approved

Proposal

Application for a Non Material Amendment (S96a) to planning permission ref. dated 14.05.2021, for 'Application for the approval of Reserved Matters pursuant to outline planning permission reference dated 16/10/2017, condition 2 pertaining to the third phase of development (Phase 3): details relating to Layout, Appearance, Scale and Landscaping'. Amendment seeks alterations to Building G and internal alterations to Building E, amended to Building G entrance and reconfiguration of the car park layout Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Nov 2025
✓
Approved
29 Jul 2026

Approved on 29 Jul 2026 · Delegated Decision · Last checked 13 Oct 2026

Documents 16

All documents on the council site ↗

Associated applications 11

Site constraints 5

Agricultural land, grade 5
Very poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project 1744 m away: M4 Junctions 3 to 12 Smart Motorway; Public transport access: PTAL 0 (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 13 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Non-Material Amendment
Postcode
UB1 1QZ
Received
26 Nov 2025
Validated
26 Nov 2025
Ward
Southall West
Case officer
Show
Target decision
23 Dec 2025
Decision
Grant with Conditions
Decision date
29 Jul 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 245 days from validation, 211 days slower than Ealing's median of 34 for amendments. Approved, as 83% of amendments here are.

71%decided within 8 weeks
83%approved
135decided in the last year

Plota live figures for amendments decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 13 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14459311
Planning Portal ref
PP-14459311
Statutory expiry
23 Dec 2025
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026