Lochearnhead Car Park Stirling FK19 8PU Data via plota.co.uk

2026/0253/DET - Detailed Planning Permission Current

Proposal

Change of use of land for the siting of mobile takeaway food kiosk Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Sept 2026
✓
Validated
5 Oct 2026
✓
Consultation
8 Oct 2026
Decision
Expected by 4 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 22 Dec 2026 and 15 Jan 2027, from Loch Lomond's recent full applications.

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
1 listed building within 150 m.
Not affected
No scheduled monument at the site

Checked on 9 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Loch Lomond - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Detailed Planning Permission
Postcode
FK19 8PU
Received
30 Sept 2026
Validated
5 Oct 2026
Ward
Trossachs And Teith Ward
Parish
Buchanan CC
Case officer
Show
Target decision
4 Dec 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 23 of the 56-day target. Loch Lomond usually decides full applications by day 84.

Day 2361 days to the predicted decision (day 84)
22%decided within 8 weeks
96%approved
117decided in the last year

Plota live figures for full applications decided by Loch Lomond in the last twelve months, from validation. Loch Lomond decision record →

Public comments

No public comments yet.

Last counted 23 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
100770446-001
Consultation
8 Oct 2026
Site or press notice
16 Oct 2026
Statutory expiry
4 Dec 2026
Env. assessment
No