1 - 5 Lower Marsh London SE1 7RJ Data via plota.co.uk

26/02033/FUL - Full Planning Permission Approved

Proposal

Change of use of part of the ground and first floors (271sqm GIA) from approved Class E medical floorspace to a flexible Class E and/or Class F1(a) use. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Jul 2026
✓
Validated
5 Aug 2026
✓
Approved
6 Oct 2026

Approved on 6 Oct 2026 · Delegated Decision · Last checked 7 Oct 2026

Site constraints 12

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Lower Marsh conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Article 4 direction
Modified Direction 1 - CAZ. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Lambeth AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 257 m away: Thames Tideway Tunnel
The site is about 257 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 213 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Town centre: Waterloo
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
1 listed building within 150 m of the postcode pin; Inside the Lambeth built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lambeth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Lambeth
Application type
Full Planning Permission
Postcode
SE1 7RJ
Received
13 Jul 2026
Validated
5 Aug 2026
Ward
Waterloo & South Bank
Case officer
Show
Target decision
7 Oct 2026
Decision
Grant Permission
Decision date
6 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Newmark

How this decision compares

Decided in 62 days from validation, 5 days slower than Lambeth's median of 57 for changes of use. Approved, as 56% of changes of use here are.

49%decided within 8 weeks
56%approved
91decided in the last year

Plota live figures for changes of use decided by Lambeth in the last twelve months, from validation. Lambeth decision record →

Public comments

No public comments yet.

400 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
5 Sept 2026
Statutory expiry
30 Sept 2026
Env. assessment
No
Lambeth
Planning Authority Score
2.7/10
Poor
#242 of 296 councils
Relevant to this application:
Change of use

Lambeth ranks #164 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Lambeth is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Lambeth decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #274 of 296
81%
Householder approved
Below avg (90%) #273 of 296
62%
Decided in 8 weeks
Below avg (63%) #164 of 296
47%
Extended time limit
Above avg (41%) #209 of 296
46%
Minor dwellings approved
70 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
42%
Change of use approved
53 decided
1,784
Total decisions
396 refused in the year to March 2026