24 Hanover Square London Data via plota.co.uk

Proposal

Alterations and extensions to 24 Hanover Square including the change of use from office to hotel, a new mansard roof, five storey redevelopment of the 1980s extension to the rear of 24 Hanover Square, a connection at ground and lower ground floor level to the adjacent hotel at 22 Hanover Square, and all works including demolition, enabling, highways and other ancillary works. (Linked with 26/06368/LBC) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Sept 2026
✓
Consultation
28 Sept 2026
Decision
Expected by 12 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 10 Nov 2026 and 21 Nov 2026, from Westminster's recent changes of use.

The consultation period closed on 19 Oct 2026.

Documents 116

Statements & assessments 34

PDF DESIGN AND ACCESS STATEMENT: PART 4 Design and Access Statement · 17 Sept 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 1 Design and Access Statement · 17 Sept 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 2 Design and Access Statement · 17 Sept 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 3 Design and Access Statement · 17 Sept 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 5 Design and Access Statement · 17 Sept 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 9 Design and Access Statement · 17 Sept 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 6 Design and Access Statement · 17 Sept 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 7 Design and Access Statement · 17 Sept 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 10 Design and Access Statement · 17 Sept 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 8 Design and Access Statement · 17 Sept 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 11 Design and Access Statement · 17 Sept 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 14 Design and Access Statement · 17 Sept 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 12 Design and Access Statement · 17 Sept 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 13 Design and Access Statement · 17 Sept 2026 View ↗ PDF TRANSPORT STATEMENT Transport Statement · 17 Sept 2026 View ↗ PDF SUSTAINABLE DESIGN STATEMENT AND BREEAM PRE-ASSESSMENT Background Papers · 17 Sept 2026 View ↗ PDF STRUCTURAL METHODOLOGY STATEMENT Structural survey · 17 Sept 2026 View ↗
PDF Commenter’s name hidden Show Statement of Community Involvement · 17 Sept 2026 View ↗
PDF PLANNING STATEMENT Planning Statement · 17 Sept 2026 View ↗ PDF PRELIMINARY ECOLOGICAL APPRAISAL AND BREEAM REPORT Report · 17 Sept 2026 View ↗ PDF NOISE IMPACT ASSESSMENT Noise impact assessment · 17 Sept 2026 View ↗ PDF LIGHTING STRATEGY DESIGN & ACCESS STATEMENT Design and Access Statement · 17 Sept 2026 View ↗ PDF HERITAGE AND TOWNSCAPE IMPACT ASSESSMENT: PART 1 Heritage Statement · 17 Sept 2026 View ↗ PDF HERITAGE AND TOWNSCAPE IMPACT ASSESSMENT: PART 2 Heritage Statement · 17 Sept 2026 View ↗ PDF FLOOD RISK ASSESSMENT Flood risk assessment · 17 Sept 2026 View ↗ PDF FIRE STATEMENT Background Papers · 17 Sept 2026 View ↗ PDF ENERGY STATEMENT Energy Assessment · 17 Sept 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Economic statement · 17 Sept 2026 View ↗ PDF STRUCTURAL METHODOLOGY STATEMENT Structural survey · 17 Sept 2026 View ↗ PDF SUSTAINABLE DRAINAGE STRATEGY Background Papers · 17 Sept 2026 View ↗ PDF RIGHTS OF LIGHT IMPACT: APPENDICES 112-150 Daylight and Sunlight assessment · 17 Sept 2026 View ↗ PDF RIGHTS OF LIGHT IMPACT: APPENDICES 76-111 Daylight and Sunlight assessment · 17 Sept 2026 View ↗ PDF RIGHTS OF LIGHT IMPACT ON NEIGHBOURING PROPERTIES REPORT Daylight and Sunlight assessment · 17 Sept 2026 View ↗ PDF RIGHTS OF LIGHT IMPACT: APPENDICES 1-75 Daylight and Sunlight assessment · 17 Sept 2026 View ↗

Plans & drawings 77

PDF TRAVEL PLAN Travel Plan · 17 Sept 2026 View ↗ PDF OUTLINE CONSTRUCTION LOGISTICS PLAN Construction Management Plan · 17 Sept 2026 View ↗ PDF DRAWING ISSUE SCHEDULE SHEET Background Papers · 17 Sept 2026 View ↗ PDF EXISTING SOUTH ELEVATION Drawing · 17 Sept 2026 View ↗ PDF EXISTING NORTH ELEVATION Drawing · 17 Sept 2026 View ↗ PDF EXISTING WEST ELEVATION Drawing · 17 Sept 2026 View ↗ PDF EXISTING EAST ELEVATION Drawing · 17 Sept 2026 View ↗ PDF PROPOSED SOUTH ELEVATION Drawing · 17 Sept 2026 View ↗ PDF PROPOSED NORTH ELEVATION Drawing · 17 Sept 2026 View ↗ PDF EXISTING INTERNAL ELEVATIONS - LEVEL GROUND FLOOR Drawing · 17 Sept 2026 View ↗ PDF EXISTING INTERNAL ELEVATIONS - LEVEL 01 Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATION INTERNAL ELEVATIONS - LEVEL GROUND Drawing · 17 Sept 2026 View ↗ PDF PROPOSED WEST ELEVATION Drawing · 17 Sept 2026 View ↗ PDF PROPOSED EAST ELEVATION Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATION INTERNAL ELEVATIONS - LEVEL 01 Drawing · 17 Sept 2026 View ↗ PDF EXISTING INTERNAL ELEVATIONS - LEVEL 02 Drawing · 17 Sept 2026 View ↗ PDF EXISTING INTERNAL ELEVATIONS - LEVEL 03 Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATION INTERNAL ELEVATIONS - LEVEL 02 Drawing · 17 Sept 2026 View ↗ PDF PROPOSED INTERNAL ELEVATIONS - LEVEL GROUND FLOOR Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATION INTERNAL ELEVATIONS - LEVEL 03 Drawing · 17 Sept 2026 View ↗ PDF PROPOSED INTERNAL ELEVATIONS - LEVEL 01 Drawing · 17 Sept 2026 View ↗ PDF PROPOSED INTERNAL ELEVATIONS - LEVEL 02 Drawing · 17 Sept 2026 View ↗ PDF HISTORIC STAIRWELL INTERNAL ELEVATIONS - EXISTING Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATION NORTH AND SOUTH ELEVATIONS Drawing · 17 Sept 2026 View ↗ PDF PROPOSED INTERNAL ELEVATIONS - LEVEL 03 Drawing · 17 Sept 2026 View ↗ PDF HISTORIC STAIRWELL INTERNAL ELEVATIONS - FABRIC ALTERATION Drawing · 17 Sept 2026 View ↗ PDF HISTORIC STAIRWELL INTERNAL ELEVATIONS PROPOSED Drawing · 17 Sept 2026 View ↗ PDF FRONT RAILING & INTERNAL LOBBY DOOR ELEVATIONS Drawing · 17 Sept 2026 View ↗ PDF EXISTING THIRD FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF EXISTING SECOND FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF EXISTING FIRST FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF EXISTING FOURTH FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF EXISTING GROUND FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF EXISTING ROOF PLAN Drawing · 17 Sept 2026 View ↗ PDF EXISTING FIFTH FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF EXISTING LOWER GROUND FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATIONS SECOND FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATIONS GROUND FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATIONS FOURTH FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATIONS FIRST FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATIONS THIRD FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATIONS FIFTH FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATIONS LOWER GROUND FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATIONS ROOF PLAN Drawing · 17 Sept 2026 View ↗ PDF EXISTING GROUND FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF PROPOSED GROUND FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF EXISTING FIRST FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF PROPOSED FIRST FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF BOUNDARY SITE PLAN Drawing · 17 Sept 2026 View ↗ PDF EXISTING THIRD FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF PROPOSED THIRD FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF EXISTING SECOND FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF PROPOSED SECOND FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF EXISTING FOURTH FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF EXISTING FIFTH FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF PROPOSED FOURTH FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF EXISTING ROOF PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF PROPOSED FIFTH FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF PROPOSED ROOF PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF PROPOSED LOWER GROUND FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF EXISTING LOWER GROUND FLOOR PLANNING BOUNDARY Drawing · 17 Sept 2026 View ↗ PDF EXISTING BOUNDARY SECTION Drawing · 17 Sept 2026 View ↗ PDF PROPOSED BOUNDARY SECTION Drawing · 17 Sept 2026 View ↗ PDF PROPOSED SECOND FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF PROPOSED THIRD FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF PROPOSED FIRST FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF PROPOSED FOURTH FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF PROPOSED FIFTH FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF PROPOSED ROOF PLAN Drawing · 17 Sept 2026 View ↗ PDF PROPOSED LOWER GROUND FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF PROPOSED GROUND FLOOR PLAN Drawing · 17 Sept 2026 View ↗ PDF PROPOSED GA SECTION 04 Drawing · 17 Sept 2026 View ↗ PDF PROPOSED GA SECTION 03 Drawing · 17 Sept 2026 View ↗ PDF EXISTING GA SECTION 01 Drawing · 17 Sept 2026 View ↗ PDF PROPOSED GA SECTION 01 Drawing · 17 Sept 2026 View ↗ PDF PROPOSED GA SECTION 02 Drawing · 17 Sept 2026 View ↗ PDF FABRIC ALTERATION GA SECTION 01 Drawing · 17 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 10

Grade II listed: 24, Hanover Square W1
List entry 1357076 · The pin is inside its outline · 47 more listed buildings within 150 m (2 Grade I, 2 Grade II*, 43 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 47 with distances
Historic England ↗
Mayfair conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
2 Article 4 directions
Article 4 Basement Development Permitted Rights Removed · Article 4 Direction Class E To C3 In Central Activities Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: City of Westminster APA 2.5
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: West End
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
National infrastructure project 1222 m away: Thames Tideway Tunnel; Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,087 m² (11,700 sq ft)
Energy ratingC (asset rating 62)
UseOffices and Workshop Businesses
HeatingAir Conditioning

From the energy performance certificate lodged in June 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission Application
Received
17 Sept 2026
Validated
17 Sept 2026
Ward
West End
Case officer
Show
Target decision
12 Nov 2026
Agent
DP9 Ltd

Decision outlook

Day 41 of the 56-day target. Westminster usually decides changes of use by day 57.

Day 4116 days to the predicted decision (day 57)
49%decided within 8 weeks
83%approved
172decided in the last year

Plota live figures for changes of use decided by Westminster in the last twelve months, from validation. Westminster decision record →

Public comments

1comment received
1 supporting

166 neighbours consulted · Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15137614
Planning Portal ref
PP-15137614
Comments by
19 Oct 2026
Site or press notice
28 Sept 2026
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Change of use

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.