Land Adjacent To Chagford Hydro, Chagford, Newton Abbot, Devon, TQ13 8JZ Data via plota.co.uk

0319/26 - Full Planning Permission Pending Consideration

Proposal

Erection of building for Controlled Environmental Agriculture together with associated external plant room and parking Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Aug 2026
✓
Validated
8 Oct 2026
Decision
Expected by 3 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 2 Dec 2026, from Dartmoor's recent agricultural works.

Documents 27

All documents on the council site ↗

Site constraints 6

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Dartmoor National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Priority Rivers
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
1 listed building within 150 m.
Not affected
Not green belt · No scheduled monument at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dartmoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dartmoor
Application type
Full Planning Permission
Postcode
TQ13 8JZ
Received
7 Aug 2026
Validated
8 Oct 2026
Ward
West Devon
Parish
Chagford
Case officer
Show
Target decision
3 Dec 2026
Decision level
Delegated decision
Applicant
Show
Agent
PLACE Architects Ltd

Decision outlook

Day 21 of the 56-day target. Dartmoor usually decides agricultural works by day 55.

Day 2135 days to the 56-day target
59%decided within 8 weeks
81%approved
71decided in the last year

Plota live figures for agricultural works decided by Dartmoor in the last twelve months, from validation. Dartmoor decision record →

Consultation & key dates

Statutory expiry
3 Dec 2026