Premier Inn Sterte Avenue West Poole BH15 2BD Data via plota.co.uk

P/26/00154/FUL - Full Planning Permission Approved

Proposal

Demolition of existing hotel restaurant and replacement with new building providing additional hotel bedrooms and breakfast room, together with alterations to the car park and all associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Jan 2026
✓
Approved
29 Jul 2026

Approved on 29 Jul 2026 · Delegated · Last checked 15 Sept 2026

Documents 79

Statements & assessments 25

PDF Appropriate assessment.pdf Appropriate Assessment · 29 Jul 2026 View ↗ PDF Consultee Response BNG Response · 29 Jul 2026 View ↗ PDF amended Flood Risk Assessment & Drainage Statement Report 3 Reports/Statements · 22 Jun 2026 View ↗ PDF BNG - Premier Inn Poole, BH15 4QQ V4.pdf Reports/Statements · 26 May 2026 View ↗ PDF Amended Energy Strategy.pdf Reports/Statements · 13 May 2026 View ↗ PDF South West Flood & Coastal response Consultee Response · 6 May 2026 View ↗ PDF Consultee Response Ecology Response · 27 Apr 2026 View ↗ PDF P24-0359 - Flood Risk Assessment & Drainage Statement Report - AGP Poole Centre Holes Bay - Issue 2.pdf Reports/Statements · 15 Apr 2026 View ↗ PDF Coastal & Flood Mgt Response Consultee Response · 25 Mar 2026 View ↗ PDF Flood Risk Assessment & Drainage Statement Report - AGP Poole Centre Holes Bay - Issue 1.pdf Reports/Statements · 10 Mar 2026 View ↗ PDF Consultee Response Ecology Response · 8 Feb 2026 View ↗ PDF transportation technical note Reports/Statements · 5 Feb 2026 View ↗ PDF Planning Statement.pdf Reports/Statements · 28 Jan 2026 View ↗ PDF Bng Metric Premier Inn Poole 3.0 Document · 15 Jan 2026 View ↗ PDF Biodiversity Net Gain Assessment Document · 14 Jan 2026 View ↗ PDF Design And Access Statement Reports/Statements · 14 Jan 2026 View ↗ PDF Arboricultural Method Statement Reports/Statements · 14 Jan 2026 View ↗ PDF Reports/Statements Energy Strategy · 14 Jan 2026 View ↗ PDF Noise Impact Assessment Reports/Statements · 14 Jan 2026 View ↗ PDF Nutrient Neutrality Assessment And Mitigation Strategy Reports/Statements · 14 Jan 2026 View ↗ PDF Preliminary Ecological Appraisal And Roost Assessment Reports/Statements · 14 Jan 2026 View ↗ PDF Transport Statement Reports/Statements · 14 Jan 2026 View ↗ PDF Sustainability Statement Reports/Statements · 14 Jan 2026 View ↗ PDF Arboricultural Survey Reports/Statements · 14 Jan 2026 View ↗ PDF Arboricultural Impact Assessment Plan Reports/Statements · 14 Jan 2026 View ↗

All documents on the council site ↗

Associated applications 2

Site constraints 7

Nutrient neutrality catchment: Poole Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Ramsar wetland about 101 m away: Poole Harbour
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 101 m away: Poole Harbour SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Nature improvement area: Wild Purbeck; Inside the Poole built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in BCP - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
BCP
Application type
Full Planning Permission
Postcode
BH15 2BD
Received
14 Jan 2026
Validated
14 Jan 2026
Ward
Poole Town
Case officer
Show
Decision
Granted
Decision date
29 Jul 2026
Decision level
Delegated
Applicant
Show
Agent
Walsingham Planning

How this decision compares

Decided in 196 days from validation, 137 days slower than BCP's median of 59 for commercial and major works. Approved, as 90% of commercial and major works here are.

49%decided within 8 weeks
90%approved
42decided in the last year

Plota live figures for commercial and major works decided by BCP in the last twelve months, from validation. BCP decision record →

Consultation & key dates

Consultation
17 Jul 2026
Comments by
27 Jul 2026
BCP
Planning Authority Score
1.7/10
Poor
#279 of 296 councils
Relevant to this application:
Householder decisions

BCP is slower than most councils at deciding householder applications, ranking #256 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
BCP decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #233 of 296
88%
Householder approved
Below avg (90%) #214 of 296
44%
Decided in 8 weeks
Below avg (63%) #256 of 296
60%
Extended time limit
Above avg (41%) #267 of 296
67%
Minor dwellings approved
346 decided (1-9 homes)
68%
Major dwellings approved
56 decided (10+ homes)
81%
Change of use approved
78 decided
2,244
Total decisions
392 refused in the year to March 2026