2 Moorgate London EC2R 6AG Data via plota.co.uk

26/01202/FULL - Full Planning Permission Under Consideration

Proposal

Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
21 Aug 2026
Consultation
7 Sept 2026
Decision
Expected by 16 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 3 Oct 2026 and 16 Oct 2026, from City of London's recent commercial and major works. Comments are open until 2 Oct 2026.

Comment on this application ↗

Documents 69

Plans & drawings 54

PDF R03-TB-DELIVERY & SERVICING MANAGEMENT PLAN F2 (260819) Accompanying report · 21 Aug 2026 View ↗ PDF R02-TB-CYCLING PROMOTION PLAN F1 (260819) Accompanying report · 21 Aug 2026 View ↗ PDF PROPOSED EAST ELEVATIONS Drawing · 21 Aug 2026 View ↗ PDF PROPOSED SOUTH ELEVATION Drawing · 21 Aug 2026 View ↗ PDF PROPOSED NORTH ELEVATION Drawing · 21 Aug 2026 View ↗ PDF PROPOSED ROOF PLAN Drawing · 21 Aug 2026 View ↗ PDF PROPOSED BASEMENT 03 PLAN Drawing · 21 Aug 2026 View ↗ PDF 5527-WRA-XX-XX-A-DR-P00001 Site Plan · 21 Aug 2026 View ↗ PDF PROPOSED BASEMENT 02 PLAN Drawing · 21 Aug 2026 View ↗ PDF PROPOSED BASEMENT 01 PLAN Drawing · 21 Aug 2026 View ↗ PDF PROPOSED SIXTH FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF PROPOSED FIFTH FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF PROPOSED GROUND FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF PROPOSED THIRD FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF PROPOSED FIRST FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF EXISTING FOURTH FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF EXISTING FIRST FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF EXISTING BASEMENT 02 FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF EXISTING BASEMENT 03 FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT ROOF FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT SOUTH ELEVATION Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT WEST ELEVATION Drawing · 21 Aug 2026 View ↗ PDF PROPOSED PAVILION STUDY Drawing · 21 Aug 2026 View ↗ PDF PROPOSED WEST ELEVATION Drawing · 21 Aug 2026 View ↗ PDF EXISTING SIXTH FLOOR FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF EXISTING FIFTH FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF EXISTING GROUND FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF EXISTING BASEMENT 01 FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF EXISTING SECOND FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF EXISTING SECTION AA Drawing · 21 Aug 2026 View ↗ PDF EXISTING THIRD FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF EXISTING MEZZANINE FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF SITE LOCATION PLAN Site Plan · 21 Aug 2026 View ↗ PDF EXISTING ROOF PLAN Drawing · 21 Aug 2026 View ↗ PDF EXISTING NORTH ELEVATION Drawing · 21 Aug 2026 View ↗ PDF EXISTING EAST ELEVATIONS Drawing · 21 Aug 2026 View ↗ PDF EXISTING SOUTH ELEVATIONS Drawing · 21 Aug 2026 View ↗ PDF EXISTING WEST ELEVATIONS Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT SECOND FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT FIRST FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT THIRD FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT GROUND FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT FOURTH FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT FIFTH FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT BASEMENT 02 FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT BASEMENT 03 FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT BASEMENT 01 FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT SIXTH FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT NORTH ELEVATION Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT MEZZANINE FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF STRIP OUT EAST ELEVATIONS Drawing · 21 Aug 2026 View ↗ PDF PROPOSED FOURTH FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF PROPOSED SECOND FLOOR PLAN Drawing · 21 Aug 2026 View ↗ PDF PROPOSED SECTION AA Drawing · 21 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 5

Bank conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
Inside the City and County of the City of London built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
EC2R 6AG
Received
21 Aug 2026
Validated
21 Aug 2026
Ward
Coleman Street
Case officer
Show
Target decision
16 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
Newmark

Decision outlook

Day 24 of the 56-day target. City of London usually decides commercial and major works by day 48.

Day 2432 days to the 56-day target
71%decided within 8 weeks
100%approved
32decided in the last year

Plota live figures for commercial and major works decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

No public comments yet.

13 neighbours consulted · Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15170558
Neighbours
2 Sept 2026
Consultation
7 Sept 2026
Comments by
2 Oct 2026
Site or press notice
11 Sept 2026
Statutory expiry
16 Oct 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 councils
Relevant to this application:
Householder decisions

City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 296. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026