1-26, Chartwell Court, 9, Broomhill Walk, Woodford Green Data via plota.co.uk

2073/26 - Full Planning Permission Approved

Proposal

Installation of new risers and horizontal runs across various elevations of buil Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Aug 2026
✓
Validated
1 Sept 2026
✓
Consultation
15 Sept 2026
✓
Approved
12 Oct 2026

Approved on 12 Oct 2026 · Last checked 12 Oct 2026

Site constraints 18

LBR LP38 (Protecting Trees and Enhancing the Landscape)LBR LP33 (Heritage)LBR LP26 (Promoting High Quality Design)LP HC1 (Heritage conservation and growth)LP G7 (Trees and woodlands)NPPF DP3 Key principles for well-designed placesNPPF DP4 The design processNPPF N2 Improving the natural environment
COA00000197 conservation area
Also Woodford Green. Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Air quality management area: Redbridge AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Special area of conservation 196 m away: Epping Forest
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 196 m away: Epping Forest SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
LBR LP38 (Protecting Trees and Enhancing the Landscape)Council record
Recorded by the council for this site.
Council site ↗
LBR LP33 (Heritage)Council record
Recorded by the council for this site.
Council site ↗
LBR LP26 (Promoting High Quality Design)Council record
Recorded by the council for this site.
Council site ↗
LP HC1 (Heritage conservation and growth)Council record
Recorded by the council for this site.
Council site ↗
LP G7 (Trees and woodlands)Council record
Recorded by the council for this site.
Council site ↗
NPPF DP3 Key principles for well-designed placesCouncil record
Recorded by the council for this site.
Council site ↗
NPPF DP4 The design processCouncil record
Recorded by the council for this site.
Council site ↗
NPPF N2 Improving the natural environmentCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
3 listed buildings within 150 m; Inside the Redbridge built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Green belt 27 m away: London; Priority habitat 39 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Redbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Redbridge
Application type
Full Planning Permission
Received
27 Aug 2026
Validated
1 Sept 2026
Ward
Churchfields
Case officer
Show
Target decision
21 Oct 2026
Decision date
12 Oct 2026
Applicant
Show
Agent
Environment and Planning Team Dalcour Maclaren

How this decision compares

Decided in 41 days from validation, 12 days faster than Redbridge's median of 53 for utility and infrastructure works. Approved, as 97% of utility and infrastructure works here are.

66%decided within 8 weeks
97%approved
29decided in the last year

Plota live figures for utility and infrastructure works decided by Redbridge in the last twelve months, from validation. Redbridge decision record →

Consultation & key dates

Alt. reference
PP-15123678
Comments by
26 Sept 2026
Site or press notice
6 Sept 2026
Statutory expiry
1 Oct 2026
Redbridge
Planning Authority Score
4.5/10
Below average
#174 of 296 councils
Relevant to this application:
Householder decisions

Redbridge ranks #129 out of 296 councils for householder decision speed. Redbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Redbridge decision statistics
Based on MHCLG data, the year to March 2026
72%
Overall approval rate
Below avg (87%) #292 of 296
82%
Householder approved
Below avg (90%) #267 of 296
69%
Decided in 8 weeks
Above avg (63%) #129 of 296
34%
Extended time limit
Below avg (41%) #90 of 296
57%
Minor dwellings approved
152 decided (1-9 homes)
83%
Major dwellings approved
12 decided (10+ homes)
32%
Change of use approved
192 decided
1,673
Total decisions
461 refused in the year to March 2026