Roundhay Wood Apartments 51 - 53 Gledhow Wood Road Gledhow Leeds LS8 4BB Data via plota.co.uk

26/06014/TR - Tree Works Current

Proposal

T1 on plan - T3 Oak - Remove main leader branch which has been weakened from limb failure/wound T2 on plan T5 Holly - Twin stem - remove long leggy branches - overshadowed G1 Oak and Laurel - Prune back to give 2m clearance to building T3 on sketch plan - T1 Horse Chestnut Crown clean to remove deadwood T4 on sketch plan - T2 Oak Crown clean to remove deadwood Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 23 Oct 2026
Decision
Expected by 17 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 8 Nov 2026 and 23 Nov 2026, from Leeds's recent tree and landscaping works.

Site constraints 6

Article 4 direction
A4D01. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
1 listed building within 150 m of the postcode pin
Nearest: Gledhow Lodge, Grade II, about 6 m from the postcode pin
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Also on the record
Coalfield, development low risk area; National infrastructure project about 443 m away: Calderdale Energy Park, at pre-application; Inside the Leeds (Leeds) built-up area; Tree preservation order about 22 m away: G1.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 26 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Leeds - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Leeds
Application type
Tree Works
Postcode
LS8 4BB
Received
around 23 Oct 2026
Validated
23 Oct 2026
Ward
Roundhay
Target decision
17 Dec 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Green Canopy Tree Specialists Ltd

Decision outlook

Day 5 of the 56-day target. Leeds usually decides tree and landscaping works by day 24.

Day 551 days to the 56-day target
96%decided within 8 weeks
90%approved
865decided in the last year

Plota live figures for tree and landscaping works decided by Leeds in the last twelve months, from validation. Leeds decision record →

Public comments

No public comments yet.

Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
17 Dec 2026
Env. assessment
No
Leeds
Planning Authority Score
5.3/10
Average
#131 of 296 councils
Relevant to this application:
Householder decisions

Leeds is faster than most councils at deciding householder applications, ranking #95 out of 296. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Leeds decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #238 of 296
85%
Householder approved
Below avg (90%) #249 of 296
73%
Decided in 8 weeks
Above avg (63%) #95 of 296
33%
Extended time limit
Below avg (41%) #78 of 296
70%
Minor dwellings approved
208 decided (1-9 homes)
86%
Major dwellings approved
36 decided (10+ homes)
68%
Change of use approved
279 decided
3,681
Total decisions
613 refused in the year to March 2026