19 Bedford Road Denton NN7 1DR Data via plota.co.uk

2026/0108/TCA - Works to Trees (Conservation Area) Approved

Proposal

Works to 1x Leyland Cypress within a conservation area Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Jan 2026
✓
Approved
17 Feb 2026

Approved on 17 Feb 2026 · Delegated · Last checked 12 Sept 2026

Site constraints 4

Denton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
5 listed buildings within 150 m of the postcode pin
Nearest: Stone House, Grade II, about 54 m from the postcode pin · 1 Grade II*, 4 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 5 with distances
Historic England ↗
Also on the record
Inside the Denton (West Northamptonshire) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area69 m² (743 sq ft)
Energy ratingD (61 out of 100), could reach B
PropertyEnd-terrace house, 4 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSandstone or limestone, as built, no insulation (assumed)

From the energy performance certificate lodged in July 2018, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in West Northamptonshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to Trees (Conservation Area)
Postcode
NN7 1DR
Received
5 Jan 2026
Validated
5 Jan 2026
Ward
Cogenhoe and The Houghtons Ward
Parish
Denton
Target decision
16 Feb 2026
Decision
No Objections
Decision date
17 Feb 2026
Decision level
Delegated

How this decision compares

Decided in 43 days from validation, about the council's usual 42 days. Approved, as 100% of tree and landscaping works here are.

92%decided within 8 weeks
100%approved
647decided in the last year

Plota live figures for tree and landscaping works decided by West Northamptonshire in the last twelve months, from validation. West Northamptonshire decision record →

Consultation & key dates

Comments by
3 Feb 2026
West Northamptonshire
Planning Authority Score
1.7/10
Poor
#280 of 296 councils
Relevant to this application:
Other decisions

West Northamptonshire is one of the slowest councils in England for householder decisions, ranking #295 out of 296. The council extends the time limit on 79% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
West Northamptonshire decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #123 of 296
93%
Householder approved
Above avg (90%) #144 of 296
18%
Decided in 8 weeks
Below avg (63%) #295 of 296
79%
Extended time limit
Above avg (41%) #295 of 296
81%
Minor dwellings approved
170 decided (1-9 homes)
83%
Major dwellings approved
24 decided (10+ homes)
86%
Change of use approved
207 decided
1,832
Total decisions
179 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.