Land to the north of Woolavington Road, within the south east of the Gravity Smart Campus site, near… Data via plota.co.uk

95/26/00001 - Local Development Orders Compliance Approved

Proposal

LDO compliance application for the erection of one 132kV and one 400kV Gas Insulated Switchgear (GIS) substation comprising five 460 Mega Volt Ampere (MVA) super grid transformers and associated switchgear, four overhead line gantries, two Distribution Network Operator (DNO) transformers and two metering kiosks; ancillary office, welfare and workshop buildings; a fire water tank and diesel generator; permanent access from Gravity Ring Road, internal access roads and parking; drainage, lighting and CCTV; security fencing, strategic landscaping and associated engineering works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Jul 2026
✓
Approved
2 Oct 2026

Approved on 2 Oct 2026 · Last checked 8 Oct 2026

Site constraints 5

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
National infrastructure project about 712 m away: Hinkley Point C Connection
The site is about 712 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Hinkley Point C Connection Project Material Change (at pre-application, about 651 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Woolavington built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sedgemoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sedgemoor
Application type
Local Development Orders Compliance
Received
9 Jul 2026
Validated
9 Jul 2026
Parish
Project wide application
Case officer
Show
Decision
Granted Permission
Decision date
2 Oct 2026

How this decision compares

Decided in 85 days from validation, 34 days slower than Sedgemoor's median of 51 for commercial and major works. Approved, as 94% of commercial and major works here are.

55%decided within 8 weeks
94%approved
35decided in the last year

Plota live figures for commercial and major works decided by Sedgemoor in the last twelve months, from validation. Sedgemoor decision record →

Consultation & key dates

Consultation
10 Jul 2026
Comments by
8 Aug 2026