Land to the West of, The Causeway, Woolavington, Bridgwater, Somerset, TA7 Data via plota.co.uk

54/26/00006 - Full Planning Permission Pending

Proposal

Installation of a synchronous condenser facility, switchroom, with ancillary 400kV infrastructure, and associated works including upgraded access, internal drives, diversion of 33kV overhead line and cable connection to New Woolavington Substation. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Aug 2026
Decision
Target date was 15 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 29 Oct 2026, from Sedgemoor's recent commercial and major works.

The consultation period closed on 1 Oct 2026.

Site constraints 7

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project 295 m away: Hinkley Point C Connection
The site is 295 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Hinkley Point C Connection Project Material Change (at pre-application, 184 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Woolavington built-up area; Priority habitat 16 m away: Coastal and floodplain grazing marsh; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sedgemoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sedgemoor
Application type
Full Planning Permission
Received
20 Aug 2026
Validated
20 Aug 2026
Parish
Woolavington
Case officer
Show
Applicant
Show

Decision outlook

Day 70, past the statutory target. 77% of commercial and major works in Sedgemoor are decided within thirteen weeks, which runs to 19 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Oct 2026.

Day 7014 days past the 56-day target
55%decided within 8 weeks
94%approved
35decided in the last year

Plota live figures for commercial and major works decided by Sedgemoor in the last twelve months, from validation. Sedgemoor decision record →

Consultation & key dates

Consultation
26 Aug 2026
Comments by
1 Oct 2026