2025/02264/FUL - Full Planning Application Approved

Proposal

Erection of an additional floor at roof level, in connection with the creation of 5no. bedrooms to the existing HMO; rebuilding existing chimney stack and reinstatement of chimney pots at roof level; erection of a bike and a bin store in the rear garden; excavation of part of the rear garden to enlarge existing rear lightwell; minor external alterations and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Aug 2025
✓
Validated
21 Aug 2025
✓
Approved
29 Oct 2025

Approved on 29 Oct 2025 · Last checked 19 Oct 2026

Documents 39

Plans & drawings 28

PDF 2504-P-211-00-PROP - GF PLAN- REV 01 Revised · 21 Oct 2025 View ↗ PDF 2504-SK-251020-001 PROPOSED REMOVAL OF HABITAT Drawing · 21 Oct 2025 View ↗ PDF DRAWING ISSUE REGISTER Drawing · 21 Oct 2025 View ↗ PDF HMO OPERATIONAL MANAGEMENT PLAN Report · 20 Aug 2025 View ↗ PDF 2504-P-001-00-EXG - LOCATION AND SITE PLAN-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-014-00-EXG - RF PLAN-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-010-00-EXG - LGF PLAN-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-011-00-EXG - GF PLAN-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-012-00-EXG - 1F PLAN-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-013-00-EXG - 2F PLAN-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-032-00-EXG - SW ELEVATION-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-033-00-EXG - NE ELEVATION-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-034-00-EXG - FULHAM ROAD ELEVATION-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-040-00-EXG - SECTION AA-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-041-00-EXG - SECTION BB-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-030-00-EXG -FRONT AND REAR ELEVATION-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-213-00-PROP - 2F PLAN-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-214-00-PROP - 3F PLAN-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-215-00-PROP - RF PLAN-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-210-00-PROP - LGF PLAN-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-212-00-PROP - 1F PLAN-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-232-00-PROP - NE ELEVATION-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-234-00-PROP - FULHAM ROAD ELEVATION-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-240-00-PROP - SECTION AA-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-241-00-PROP - SECTION BB-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-250-00-PROP - BIN AND CYCLE STORE-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-230-00-PROP - FRONT AND REAR ELEVATION-. Drawing · 20 Aug 2025 View ↗ PDF 2504-P-231-00-PROP - SW ELEVATION-. Drawing · 20 Aug 2025 View ↗

All documents on the council site ↗

Associated applications 3

Site constraints 8

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Walham Green conservation area
Also 63. Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Archaeological priority area: Medieval and post-medieval settlement and market place of the parish.
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Fulham Town Centre
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 860 m away: Thames Tideway Tunnel
The site is 860 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 16 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £200,000 in March 2024. Other property, leasehold.

1 March 2024£200,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area46 m² (495 sq ft)
Energy ratingC (asset rating 67)
UseRetail/Financial and Professional Services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in October 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
SW6 5PU
Received
20 Aug 2025
Validated
21 Aug 2025
Ward
Walham Green
Case officer
Show
Decision
APPLICATION APPROVED
Decision date
29 Oct 2025
Applicant
Show
Agent
Finn O'Donoghue / Iceni Projects

How this decision compares

Decided in 69 days from validation, 7 days faster than Hammersmith and Fulham's median of 76 for full applications. Approved, as 98% of full applications here are.

29%decided within 8 weeks
98%approved
759decided in the last year

Plota live figures for full applications decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
26 Aug 2025
Comments by
16 Oct 2025
Site or press notice
3 Sept 2025
Statutory expiry
29 Oct 2028
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.