Car Park Adjacent To 25 Mandela Way London Southwark SE1 5SZ Data via plota.co.uk

26/AP/1763 - Approval of Details Approved

Proposal

Details of Condition 23 'Circular Economy Post Completion Report' required by planning permission ref. 'Demolition of existing buildings and structures on the site and redevelopment to provide an up to four storey building to accommodate industrial and logistics (Use Class B2, B8 and Class E(g)) together with plant, landscaping, the formation of new accesses and alterations to existing accesses, associated vehicle and cycle parking and other associated works.' Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jun 2026
✓
Validated
18 Jun 2026
✓
Approved
3 Aug 2026

Approved on 3 Aug 2026 · Source Team · Last checked 4 Aug 2026

Associated applications 13

Site constraints 12

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
2 Article 4 directions
Old Kent Road North District Town Centre · Site allocation NSP58: Mandela Way. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Locally significant industrial site
A borough-level industrial site.
Boroughs protect these sites for industrial and related uses.
Archaeological priority area: North Southwark and Roman Roads
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 810 m away: Thames Tideway Tunnel
The site is 810 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 521 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Wider setting of protected view 23A.1 Centre of Bridge over the Serpentine to the Palace of Westminster; Radon affected area, class 2; Inside the Southwark built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square; Tree preservation order 21 m away: 25 Mandela Way London Se1 5ss.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Approval of Details
Postcode
SE1 5SZ
Received
17 Jun 2026
Validated
18 Jun 2026
Ward
South Bermondsey
Parish
Bermondsey And Rotherhithe
Case officer
Show
Target decision
12 Aug 2026
Decision
AOD - Granted
Decision date
3 Aug 2026
Decision level
Source Team
Applicant
Show
Agent
DP9 Ltd

Public comments

No public comments yet.

Last counted 4 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
12 Aug 2026
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 councils
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026