Spring Wood Stables New Road Deighton York YO19 6EZ Data via plota.co.uk

26/01460/FUL - Full Application Awaiting decision

Proposal

Erection of an agricultural building Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Aug 2026
✓
Validated
13 Aug 2026
Decision
Expected by 8 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 57.

The consultation period closed on 30 Sept 2026.

Site constraints 5

Green belt: York
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 975 m away: Light Valley Solar
The site is 975 m from the project boundary. Generating station, under examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £275,500 in June 2025. Other property, freehold.

23 June 2025£275,500Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in York - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
York
Application type
Full Application
Postcode
YO19 6EZ
Received
6 Aug 2026
Validated
13 Aug 2026
Ward
Wheldrake
Parish
Deighton Parish Council
Case officer
Show
Target decision
8 Oct 2026
Applicant
Show

Decision outlook

Day 57, past the statutory target. 88% of full applications in York are decided within thirteen weeks, which runs to 12 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 571 days past the 56-day target
62%decided within 8 weeks
84%approved
569decided in the last year

Plota live figures for full applications decided by York in the last twelve months, from validation. York decision record →

Public comments

2comments received
2 neutral

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15074249
Planning Portal ref
PP-15074249
Comments by
30 Sept 2026
Statutory expiry
8 Oct 2026
Env. assessment
No
York
Planning Authority Score
3.7/10
Below average
#213 of 296 councils
Relevant to this application:
Householder decisions

York ranks #156 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
York decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #255 of 296
87%
Householder approved
Below avg (90%) #237 of 296
64%
Decided in 8 weeks
Above avg (63%) #156 of 296
42%
Extended time limit
Above avg (41%) #168 of 296
69%
Minor dwellings approved
104 decided (1-9 homes)
71%
Major dwellings approved
17 decided (10+ homes)
63%
Change of use approved
68 decided
1,278
Total decisions
224 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.