183 Kings Road Kingston Upon Thames KT2 5JH Data via plota.co.uk

26/02059/HOUF - Householder - Fast Track Pending Consideration

Proposal

Erection of single storey side and rear, first floor rear extension Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Sept 2026
✓
Validated
12 Oct 2026
✓
Consultation
12 Oct 2026
Decision
Expected by 11 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 6 Dec 2026, from Kingston upon Thames's recent extensions.

Comments are open until 2 Nov 2026

Comment on this application ↗

Documents 21

All documents on the council site ↗

Site constraints 8

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Kingston upon Thames AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
2 listed buildings within 150 m
Nearest: Roman Catholic Church of St Agatha, Grade II, 28 m away · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Also on the record
Special area of conservation 430 m away: Richmond Park; SSSI 430 m away: Richmond Park SSSI; Inside the Kingston upon Thames built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square; National infrastructure project 1489 m away: Teddington Direct River Abstraction (TDRA), at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 12 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 6

Last sold for £620,000 in October 2024. Semi-detached house, freehold.

8 October 2024£620,000
27 March 2020£508,000
31 May 2013£429,500
19 October 2007£325,000
28 May 1999£122,000
16 August 1995£85,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area66 m² (710 sq ft)
Energy ratingD (60 out of 100), could reach B
PropertySemi-detached house, 3 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in August 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Kingston upon Thames - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder - Fast Track
Postcode
KT2 5JH
Received
25 Sept 2026
Validated
12 Oct 2026
Ward
Kingston Gate
Parish
Kingston And North Kingston
Case officer
Show
Target decision
11 Nov 2026
Applicant
Show
Agent
City Lofts London

Decision outlook

Day 16 of the 56-day target. Kingston upon Thames usually decides extensions by day 55.

Day 1640 days to the 56-day target
86%decided within 8 weeks
85%approved
845decided in the last year

Plota live figures for extensions decided by Kingston upon Thames in the last twelve months, from validation. Kingston upon Thames decision record →

Public comments

No public comments yet.

6 neighbours consulted · Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15247090
Planning Portal ref
PP-15247090
Neighbours
12 Oct 2026
Consultation
12 Oct 2026
Comments by
2 Nov 2026
Statutory expiry
11 Nov 2026
Env. assessment
No
Kingston upon Thames
Planning Authority Score
6.5/10
Good
#76 of 296 councils
Relevant to this application:
Householder decisions

Kingston upon Thames is faster than most councils at deciding householder applications, ranking #33 out of 296. Only 20% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Kingston upon Thames is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Kingston upon Thames decision statistics
Based on MHCLG data, the year to March 2026
75%
Overall approval rate
Below avg (87%) #288 of 296
82%
Householder approved
Below avg (90%) #266 of 296
81%
Decided in 8 weeks
Above avg (63%) #33 of 296
20%
Extended time limit
Below avg (41%) #18 of 296
44%
Minor dwellings approved
124 decided (1-9 homes)
60%
Major dwellings approved
10 decided (10+ homes)
42%
Change of use approved
26 decided
1,112
Total decisions
274 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.